1.0 Tap Clean
-
1.1 Inspect all spray heads and confirm they are clear and water running freely (Case Clean Tech to clean)
-
1.2 Inspect all taps, are there signs of scale that requires attention (Case Clean Tech to clean)
-
1.3 Inspect all plugholes and sinks, are there signs of scale that requires attention (Case Clean Tech to clean)
-
1.4 Check if site has personal / public showers (Case Clean Tech to clean)
-
1.5 Details of further works required after the inspection
2.0 Till Heater Clean
-
2.1 Heater Grill Cleaned And Clear Of Dust
-
2.2 Heater Element Cleaned And Clear Of Dust
-
2.3 Details of further works required after the inspection
3.0 A/C Filter Clean
-
3.1 Remove and cleaned all Filters on Sales Floor A/C Units
-
3.2 Remove and cleaned Filter in Managers office A/C Units
-
3.3 Details of further works required after the inspection
4.0 Plant Condenser Clean
-
4.1 Refrigeration Plant Condensers Washed
-
4.2 A/C Plant Condensers Cleaned
-
4.3 Condensing Unit Condensers Cleaned
-
4.3 Details of further works required after the inspection
5.0 Oven Clean
-
5.1 Oven Cleaned
-
5.2 Oven Neutralised
-
5.3 Details of further works required after the inspection
6.0 FPG/Counterline Clean
-
6.1 Hot Counter Cleaned
-
6.2 Cold Counter Cleaned
-
6.3 Details of further works required after the inspection