Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Plan
-
Contact details of architect or principal designer
-
Description of works
-
Is there anything the client has made you aware of?
-
Please advise of any issues raised by the client
-
Start date
-
Estimated completion date
-
Are there toilet, wash and welfare facilities
-
Please advise of remote welfare facilities
Working together
-
Are there other people on site?
-
Please enter name and numbers of persons on site
-
Who is the principal contractor?
-
How will you keep everyone updated during the job
Falls from height
-
•Make sure ladders are at the correct angle and are secure
•Prevent people and materials falling from roofs, gable ends, working platforms and other open edges using guard rapid mid rails and toe boards -
Are there any hazards present
-
Add media
-
Have control measures been implemented.
-
Please advise of control measures
-
Add media
Collapse of excavations
-
•Shore excavations; either cover or barrier excavations to stop people and plant falling in
-
Are there any hazards present?
-
Have control measures been implemented. If so what are these measure
Collapse of structures
-
• Support structures (such as walls, beams, chimney breasts and roofs) with props; ensure props are installed by a competent person
-
Are there any hazards present?
-
Add drawing
-
Have control measures been implemented. If so what are these measure
Exposure to building dust
-
•Prevent dust by using wet cutting and vacuum extraction on tools; use a vacuum cleaner rather than sweeping; use a suitable, well-fitting mask
-
Are there any hazards present?
-
Have control measures been implemented. If so what are these measure
Exposure to Asbestos
-
•If you suspect that asbestos might be present, don’t start work until a demolition/refurbishment survey has been carried out •Make sure everyone on the site is aware of the results
-
Have you reviewed the asbestos report?
-
Are there any hazards present?
-
Have control measures been implemented. If so what are these measure
-
Is it considered safe to commence work?
Activities that require supervision
-
Who will be supervising?
-
Are there any hazards present?
-
Have control measures been implemented. If so what are these measure
Electricity
-
•Turn electricity supply and other services off before drilling into walls. Do not use excavators or power tools near suspected buried services
-
Are there any hazards present?
-
Have control measures been implemented. If so what are these measure
Risks to members of the public, the client and others
-
• Keep the site secure to prevent unauthorised access; net scaffolds, use rubbish chutes
-
Are there any hazards present?
-
Have control measures been implemented. If so what are these measure
Other hazards
-
Are there any other hazards on site