Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Checklist

  • Approved materials only, confirm before commencing work

  • Equipment received in good condition

  • Verified equipment are specified units

  • Code clearances have been maintained. Panels mount at 78". Switchgear to be set on housekeeping pads

  • Bolts have been torque checked

  • Units are installed per plans and specifications. Record deviations

  • Systems functions as specified

  • Berg foreman & QC have reviewed

  • Inspection modification and/or repairs related documentation has been provided

  • Record drawings/documents provided submitted

  • Select date

  • Add media

  • QC signature

  • Foreman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.