Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Checklist
-
Approved materials only, confirm before commencing work
-
Equipment received in good condition
-
Verified equipment are specified units
-
Code clearances have been maintained. Panels mount at 78". Switchgear to be set on housekeeping pads
-
Bolts have been torque checked
-
Units are installed per plans and specifications. Record deviations
-
Systems functions as specified
-
Berg foreman & QC have reviewed
-
Inspection modification and/or repairs related documentation has been provided
-
Record drawings/documents provided submitted
-
Select date
-
Add media
-
QC signature
-
Foreman