Title Page

  • Conducted on

  • Prepared by

Property Details

  • Applicant’s Name

  • Property Address:

  • Approved BC Documents and Amendments on site

  • Prior Inspections passed or instructions addressed

Restricted Building Work - LPB License Check

  • Name of LBP: (If not on site, ask who the cladding LBP is)

  • LPB on site

  • License Sighted?

  • License Number

  • Expiry Date

Details

  • Consent Number:

  • Lot

  • Wind

  • LBP Onsite:  Yes  No

  • License sighted:  Yes  No

  • License No: (if sighted)

  • Expiry Date:

Flashings / Wrap / Ventilation

  • Control joints

  • Flashings of penetrations

  • Lapping flashing

  • Head flashing

  • Roof / wall & parapet flashing details

  • Bottom plate cover

  • Cavity closers

  • Internal / external angles

  • Fixings for down pipes, lights etc

  • Window / metre box installation

  • Deck & balustrade flashings

  • Stop-end flashings – split gables

  • Building wrap / support /fixing

  • Weep/ventilation holes/vermin proof

Brick/Aerated Concrete Block

  • Cavity 40 – 75mm / free draining

  • Brick ties (ss/galvanised) / battens

  • No pipe work in cavity

  •  Washouts / Cavity cleaned, rebate sealed

  • Size of mortar joints 7 – 13 mm

  • Seating of bottom brick (mortar overhang)

  • Height of veneer

  • Lintel bars / fixings

  • Cavity sealed from roof space

  • Slope to sills 15° minimum

  •  Window support bars fitted

Battens (Ventilated Cavity)

  • Timber treatment

  • Battens: thickness (20 mm), spacing, fixings

Weatherboard/Ply/Corrugate

  • Cladding fixing/support/nail placement

  •  Weathering at bottom of waetherboards

Plaster: Substrate/Solid Plaster (mesh) Poly

  • Fibre cement sheet / H3 plywood

  •  Mesh type

  • Reinforcing around openings

  • 6 - 9mm spacers

  • Galvanised

  • Proprietary self-spacing mesh

  • Fixings

Monolithic

  • Fixing detail of backing

  • Ground level clearance

  • Internal / external angles

Decks

  • Deckleve/floor level/fall/clearances

  • Deck Finish/Membrane

  • Outlets and Overflows

  • Barrier heights/fixings/flashings

  • Drip Edge

Documents:

  • Membrane Certificate

  • PS4

  • Installation Memorandum

Specific Design

  • Inspections completed

OUTCOME OF DECISION

  • Work Complies

  • PASS

  • FAIL - but work may continue until next inspection

  • FAIL - Repeat Inspection

  • Additional Fee

Page 1of 2

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.