Information

  • Site

  • Client

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Hard Floors - Weekly

  • NOTE: In the context of this schedule, hard floors include terrazzo, linoleum, PVC and thermoplastic, marble, lime stone tile etc. All hard floors are to be maintained in accordance with manufacturers instructions.

  • Swept or mop swept floors to be free of all dust and litter. No build up of dust and soilage at edges, under furniture or in corners to be permitted.

  • Damp or wet mopped floors to be free of all scuffmarks and soilage adhering to floor.

Rear Exit - Weekly

  • Wells after cleaning to be free if all accumulation of litter, debris and soilage in general. Tiled frontages to be wet mopped.

Stairs - Weekly

  • Stairs and intermediate landing to be maintained so as to be free of dust, debris, tarter ears, smears, fluff and any other soilage. Particular attention to be given to edges, corners, strings and risers to ensure no accumulation or build up of soilage occurs.

  • Banister rails and balustrades, including side panels, to be free of dust after dusting.

  • Spot cleaning and damp wiping to remove all stains, marks, streaks, finger marks or other soilage.

Walls, Doors etc. - Weekly

  • All surfaces to be free of dust and smears after dusting.

  • All finger marks, smears, stain and general soilage to be removed during cleaning by spot cleaning, damp wiping or washing as appropriate, to leave surfaces clean, dry and smear free.

  • No smears, streaks or build up of soilage, particularly on the skirting and door kick plates to be permitted.

  • Walls to be free of dust and smears after dusting.

Fire Appliances, Ledges Etc. - Weekly

  • To be free of dust, smears, streaks and stains after cleaning.

  • Dust to be suction cleaned from voids between secondary glazing and windows.

Rear Area Glass Doors - Weekly

  • After cleaning, both the inside and outside of external windows windowpanes to be free of all marks, streaks and smears.

  • All streaks and runs to be removed from surrounds as they occur

Rear Entrances - Including Reception Desks, Metalwork, Walls & Paintwork - Weekly

  • The area in front and to the sides of all entrances will be maintained free from debris, litter, spills etc.

External Areas, Basement Areas - Weekly

  • All areas will be maintained free from debris, litter, etc.

  • Corridor lighting to be kept clear of dust and grime (dry wiped)

  • Plant rooms will be clear of dust and grime. On a quarterly basis floors will be damp mopped. For clarity, the cleaning of ANY plant and equipment is not included in this contract.

Periodic Special Cleans

  • Periodic cleans are defined as those specific tasks that will be time defined in their completion. That time definition will be weekly, bi-weekly, calendar monthly, bi-monthly, quarterly, six monthly and annually.

Authorisation signatures

  • Auditor signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.