Title Page

  • Project Name

  • TFT Project Number

  • Client

  • Principal Contractor

  • Site Manager

  • Date

  • Client CDM Advisor (TFT) - Inspection by:

  • Executive Summary

  • Scoring

  • Red: Significant Non-Compliance / Requires Immediate Action

  • Amber: Non-Compliance or Observation of Risk of Non-Compliance. Corrective action to be taken (usually on shift or within 24 hours)

  • Green: Compliant, or Positive comments

Site H&S Arrangements

  • Generally, are arrangements suitable for:

  • Site security, including segregation (fencing/hoarding) of all work areas

  • Site access

  • Protection of members of the public from the works

  • Construction warning signage displayed at appropriate areas including site perimeter

  • Material storage arrangements

  • Waste storage arrangements

  • Adequate lighting for all work areas

  • Site tidiness

  • Safe use of tools and equipment

  • Trailing leads and cables secured or covered / trip hazards

  • Control of dust

  • Control of noise

  • Personal Protective Equipment (PPE)

  • Working with hazardous substances

  • Demolition Activities

  • Works near / with asbestos

  • Work at Height

  • Scaffolds

  • Ladders

  • Step ladders

  • Mobile towers

  • MEWPs

  • Roof work

  • Work near excavations

  • Work at height - other (specified below)

  • Excavations

  • Excavation Segregation

  • Excavation Support

  • Excavations - other (specified below)

  • Traffic Management

  • Vehicular & Pedestrian segregation

  • Safe use of plant and vehicles

  • Parking (Vehicles parked considerately?)

  • Storage of Plant / vehicles when not in use

  • Fire Safety Arrangements

  • Fire Escape Route Drawing displayed at each fire point?

  • Are works suitably arranged so that no part of the works adversely affecting existing emergency escape provisions?

  • Are there a suitable number of fire extinguishers and means of raising the alarm located within the work area?

Site Welfare & First Aid

  • Suitable provision of:

  • Toilets - Male & Female

  • Soap / Handwash

  • Hot & cold running water for handwashing

  • Paper Towels / Hand Dryers

  • Drinking Water

  • Break Room

  • Drying Room

  • Showers (if required)

  • Site Office Accomodation

  • First Aiders

  • First Aid Kits

  • Burns Kit

  • Eye Wash

  • Defibrillator

Key Documents

  • F10 Notification - is this displayed and up-to-date?

  • Are Insurances displayed?

  • HSE Law poster displayed?

  • Is Pre-Construction information accessible to site management team?

  • Is there a suitably developed Construction Phase Plan and is it up to date?

  • Evidence of / Suitable arrangements for:

  • Signing in

  • Management of Visitors

  • Inductions (inc. checks of CSCS / CPCS etc)

  • RAMS for Current Tasks (spot check of at least one)

  • Permit to Work Systems

  • COSHH Assessments / Safety Data Sheets

  • Statutory Plant & Equipment Checks (LOLER & PUWER)

  • Temporary Works Register

  • H&S Monitoring by Principal Contractor

  • H&S Monitoring by Subcontractors

  • Toolbox talks

  • Traffic Management Plan

  • Site Fire Risk Assessment

  • Fire Safety Management Plan

  • Site Waste Management Plan

  • Accident Book

  • Recording and investigation of all Accidents, Incidents & Near Misses

  • Site procedure for notifying Client, CDMA and PM in event of potentially RIDDOR-reportable accidents

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.