Title Page
-
Site conducted
-
Client
-
Contractors on site
-
Conducted on
-
Prepared by
-
Location
-
Site Manager Name
Untitled Page
-
Detail the scope of the project / works / CDM roles
-
F10 notification in place
-
Any HSE, LA or EA visits to site
-
Site notice board completed
-
Site security, CCTV, Signage, public protection
-
Operatives aware of Risk Assessment & Method statements
-
Evidence of site inductions carried out & sufficient information given
-
CDM CPP, Demolition plans in place and in date, suitable & sufficient
-
Licences, permits an other statutory requirements in place and available to view
-
Welfare arrangements in place & checked
-
Laydown & compound areas suitable bucket change, layout, zones etc
-
Safe access & egress to workplace / routes / excavations etc
-
Emergency preparedness & plans - tested
-
Fire safety - RA, wardens, fire fighting
-
CoSHH and other hazardous substances & storage
-
General housekeeping
-
Slip, trip, falls - manholes, pot holes, leading edges, ground conditions
-
Worker noise controls in place & understood by workers
-
HAVS controls in place, understood & monitored , Whole body vibration considerations
-
TM plans in place with correct signage , sandbagged and checked
-
Site PVMP in place - parking, deliveries, flat bed WAH, banksman etc
-
NRSWA controls in place, Highway spec PPE, Highways act 1980 conformance, trained ops & sup
-
Asbestos management plans, licences / notifications , controls & competence
-
Lone worker procedures in place & checked
-
Work at height controls in place, rescue plans tested, Harness and lanyard inspected
-
Scaffold controls in place TG20 compliance, SG conformance, CISRS
-
Excavation works checked, temporary works in place
-
LOLER checks & controls
-
Lift plans & cranage
-
PUWER checks & controls
-
Electrical safety, PAT, FAT, 110V site, RCD etc
-
Site lighting - sufficient, LUX levels.
-
PPE requirements & conformance
-
First aid controls, kits, FAW trained, needs assessments
-
Permits in place, signed, dated & at point of works with required appendices
-
Utilities projection - GS6, HSG47, EUSR, Insulated tools, CAT & GENNY, FR/ ARC PPE
-
Confined Spaces adequately controlled with tested rescue plan
-
Temporary works file available and processes in place, TWS / TWC appointments in place
-
Works involving over or near water suitably controlled - including environmental requirements
-
Explosive atmospheres, DSEAR controls in place
-
Steel erection controls in place
-
Manual Handling considerations & training
-
Lead hazards on site controlled, health checks
-
Other activities requiring occupational health screening
-
Worker Skin checks carried out and logged
-
Other Health issues - including stress considerations
-
Worker communication & consultation - TBT
-
Demolition controls in place - sequence, competence, COSHH, utilities, UXO, plant & equipment, stockpiles, Section 80
-
DSE considerations
-
Accident, incident & near miss reporting processes
-
Site inspections carried out by manager or supervisor
-
Environmental controls in place
-
Ecology and other surveys carried out & understood the requirements of such
-
Environmental training / bulletins / toolbox talks carried out
-
Spill & pollution controls in place
-
Nuisance prevention & controls
-
Consents & licences in place where required
-
Site waste management plans & controls, skips, hazardous waste, waste segregation
-
Archaeology & Heritage checks carried out
-
Contaminated land controls
-
Water management, permissions stand pipes etc
-
CDM PD client H&S file controls, population requirements
-
Considerate constructors registered
-
QA controls in place & ITP's documented
-
Other information / checks completed
Comments & findings
-
Finding 1
-
Finding 2
-
Finding 3
-
Finding 4
-
Finding 5
-
Finding 6
-
Finding 7
-
Finding 8
-
Finding 9
-
Finding 10
-
Finding 11
-
Finding 12
-
Finding 13
-
Finding 14
-
Finding 15
General Comments
-
Add General Comments below
Untitled Page
-
Site Manager
-
Site Auditor