Title Page

  • Site conducted

  • Client

  • Contractors on site

  • Conducted on

  • Prepared by

  • Location
  • Site Manager Name

Untitled Page

  • Detail the scope of the project / works / CDM roles

  • F10 notification in place

  • Any HSE, LA or EA visits to site

  • Site notice board completed

  • Site security, CCTV, Signage, public protection

  • Operatives aware of Risk Assessment & Method statements

  • Evidence of site inductions carried out & sufficient information given

  • CDM CPP, Demolition plans in place and in date, suitable & sufficient

  • Licences, permits an other statutory requirements in place and available to view

  • Welfare arrangements in place & checked

  • Laydown & compound areas suitable bucket change, layout, zones etc

  • Safe access & egress to workplace / routes / excavations etc

  • Emergency preparedness & plans - tested

  • Fire safety - RA, wardens, fire fighting

  • CoSHH and other hazardous substances & storage

  • General housekeeping

  • Slip, trip, falls - manholes, pot holes, leading edges, ground conditions

  • Worker noise controls in place & understood by workers

  • HAVS controls in place, understood & monitored , Whole body vibration considerations

  • TM plans in place with correct signage , sandbagged and checked

  • Site PVMP in place - parking, deliveries, flat bed WAH, banksman etc

  • NRSWA controls in place, Highway spec PPE, Highways act 1980 conformance, trained ops & sup

  • Asbestos management plans, licences / notifications , controls & competence

  • Lone worker procedures in place & checked

  • Work at height controls in place, rescue plans tested, Harness and lanyard inspected

  • Scaffold controls in place TG20 compliance, SG conformance, CISRS

  • Excavation works checked, temporary works in place

  • LOLER checks & controls

  • Lift plans & cranage

  • PUWER checks & controls

  • Electrical safety, PAT, FAT, 110V site, RCD etc

  • Site lighting - sufficient, LUX levels.

  • PPE requirements & conformance

  • First aid controls, kits, FAW trained, needs assessments

  • Permits in place, signed, dated & at point of works with required appendices

  • Utilities projection - GS6, HSG47, EUSR, Insulated tools, CAT & GENNY, FR/ ARC PPE

  • Confined Spaces adequately controlled with tested rescue plan

  • Temporary works file available and processes in place, TWS / TWC appointments in place

  • Works involving over or near water suitably controlled - including environmental requirements

  • Explosive atmospheres, DSEAR controls in place

  • Steel erection controls in place

  • Manual Handling considerations & training

  • Lead hazards on site controlled, health checks

  • Other activities requiring occupational health screening

  • Worker Skin checks carried out and logged

  • Other Health issues - including stress considerations

  • Worker communication & consultation - TBT

  • Demolition controls in place - sequence, competence, COSHH, utilities, UXO, plant & equipment, stockpiles, Section 80

  • DSE considerations

  • Accident, incident & near miss reporting processes

  • Site inspections carried out by manager or supervisor

  • Environmental controls in place

  • Ecology and other surveys carried out & understood the requirements of such

  • Environmental training / bulletins / toolbox talks carried out

  • Spill & pollution controls in place

  • Nuisance prevention & controls

  • Consents & licences in place where required

  • Site waste management plans & controls, skips, hazardous waste, waste segregation

  • Archaeology & Heritage checks carried out

  • Contaminated land controls

  • Water management, permissions stand pipes etc

  • CDM PD client H&S file controls, population requirements

  • Considerate constructors registered

  • QA controls in place & ITP's documented

  • Other information / checks completed

Comments & findings

  • Finding 1

  • Finding 2

  • Finding 3

  • Finding 4

  • Finding 5

  • Finding 6

  • Finding 7

  • Finding 8

  • Finding 9

  • Finding 10

  • Finding 11

  • Finding 12

  • Finding 13

  • Finding 14

  • Finding 15

General Comments

  • Add General Comments below

Untitled Page

  • Site Manager

  • Site Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.