Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Climbing Pinnacle Daily Checks

  • General Checks - Sign - offs

Environment

  • Room Temperature is suitable?<br>

Visual and Safety

  • All signage present and visible?<br>

  • All Signage is clean, undamaged, and correctly mounted?<br>

Emergencies

  • Fire Exit is accessible?<br>

  • Fire Safety Equipment (used by zone) is Present and Accessible?<br>

  • All Lights Work?<br>

  • First Aid (used by zone) is clearly visible and mounted on wall?

  • First Aid is fully stocked?

General Lay Out

  • Bean Bags are correctly placed, and out of participants way?<br>

  • Refreshing Wipes are stocked enough for the day?<br>

  • Cleaning requirements have been reported to the cleaners point of contact?<br>

  • All surrounding glass panels have been cleaned?

  • Mats have been vacuumed?

  • No additional papers, stickers or trash is stuck to the mats?

  • Climbing Pinnacle Checks Sign-offs (confirmed by the individual who did the checks)

General

  • Is Climbing Pinnacle structurally sound?

  • Climbing Holds are free of hazardous damage?<br>

  • Performed a full climb on each cable.<br>

  • Climbing Holds are tightly connected and don't spin.<br>

  • Climbing Routes are correctly tagged and clearly visible.<br>

  • Perform a Test Climb - Not higher than 2 meters off the ground.<br>

Auto Belay Lines

  • Leakage of the Hydraulic Fluid is at a minimum.<br>

  • Auto Belay Lines are free of any visible damage?<br>

  • Pulleys are rotating freely and not full of grease?<br>

  • Hydraulic Pressure is between 70 - 75 PSI (4.8 - 5.2 bar)<br>

Line Markings

  • Line Markers are clean, clear and correctly placed?<br>

Area Specific Equipment

  • All Climbing shoes are suitable for operation?<br>

  • All Climbing shoes have been sprayed with disinfectant?<br>

  • All chalk bags stocked up?<br>

  • Chalk bag belts are connected to the bags?<br>

Mats

  • Connection Fabrics safely cover the gaps between the mats?<br>

  • Are Safety Mats clear of any hazards?<br>

  • Hydraulic Pressure Record for today:

  • Activity Leader

  • Activity Specialist

  • All checks must be ticked and signed by the trained ERCA instructor who carried out the specific checks. Follow monthly checks guide line as per Adventure HQ
    activities monthly check the manual. All issues must be reported to the respective Team leader. All monthly check must be completed within the time line.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.