Information

  • Audit Title / Project Description

CMUX Project Details

Project Details

  • CP Number

  • SP Number

  • Project (Sequence) Nbr

  • Site Name AGH

  • Site Address AGH
  • Site Name NU

  • Site Address NU

System Details

  • CMUX Node Code

  • Installation Type

  • Subrack 1 Type

  • Subrack 2 Type

  • Rack Code

Tester Details

  • Name / Signature

  • Company

  • Phone Number

  • Date

1 Common Tests

1.1 Configuration

  • 1.1.1 Configuration as specified in detailed design

1.2 Power Up Tests

  • 1.2.1 Fans Power Up

  • 1.2.2 Subrack Power Up

  • 1.2.3 Mains Fail Test

  • 1.2.4 Alarms

2 Broadband Tests

2.1 Cards Power Up

  • 2.1.1 AICC power up

  • 2.1.2 AANC power up

  • 2.1.3 BSEC power up

  • 2.1.4 LTAC (or LTAC-C) power up

  • 2.1.5 NACC (or NACC-C) power up

2.2 Alarm Tests

  • 2.2.1 LTAC (or LTAC-C) alarm in AWS

  • 2.2.2 LTAC (or LTAC-C) alarm in ADM

2.3 ADSL Port Tests

  • 2.3.1 ADSL Modem Synchronisation

3 End to End Speed Test Results

End to End & Speed Test

  • Subrack

  • 10meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg upload speed

  • Kbytes

  • Seconds

  • Comments

End to End & Speed Test

  • Subrack

  • 10meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg upload speed

  • Kbytes

  • Seconds

  • Comments

End to End & Speed Test

  • Subrack

  • 10meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg upload speed

  • Kbytes

  • Seconds

  • Comments

End to End & Speed Test

  • Subrack

  • 10meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg download speed

  • Kbytes

  • Seconds

  • Comments

  • 0.5meg upload speed

  • Kbytes

  • Seconds

  • Comments

4 Narrowband Tests

4.1 Cards Power Up

  • 4.1.1 AICC power up

  • 4.1.2 AANC power up

  • 4.1.3 Narrowband Customer Line Cards power up

4.2 Alarm Tests

  • 4.2.1 Board alarms in AWS

  • 4.2.2 Board alarms in ADM

  • 4.2.3 Board alarms in CMEM

4.3 Connection To CMEM

  • 4.3.1 Connection To CMEM

4.1 Line Tests

  • 4.4.1 Line Tests from CMEM

  • 4.4.2 POTS Testing

  • 4.4.3 Basic Access Testing

5 Optical Fibre Bearer Tests

5.1 System Details

  • Line System Code

  • Multiplexed Bearer Code

  • PGS ID

  • Fibre Bearer Details

5.2 Line Power

  • NU => AGH

  • NU Power Transmit (dbm)

  • AGH Power Receive (dbm)

  • AGH => NU

  • NU Power Receive (dbm)

  • AGH Power Transmit (dbm)

5.3 Test Results

  • Loss NU (TX) to AGH (RX) (dbm)

  • Insertion Loss (dbm)

  • Guaranteed Optical Margin (db)

  • Loss AGH (TX) to NU (RX) (dbm)

  • Insertion Loss (dbm)

  • Guaranteed Optical Margin (db)

5.4 Bit Error Measurements

  • All Tribs looped and tested for 3 hours?

  • All results to specifications?

  • Comments

6 Alarm Testing and Final Check

6.1 Equipment Alarms

  • 6.1.1 GOC Sequence No.

  • 6.1.2 CDC Alarm Types Sequence No.

6.2 Environmental Alarm

  • 6.2.1 Special Services Sequence No.

  • 6.2.2 CDC Alarm Types Sequence No.

6.3 Power Alarm

  • 6.3.1 STOC Sequence No.

  • 6.3.2 CDC Alarm Types Sequence No.

6.4 Final Check

  • 6.4.1 Housing Free of Alarms

7 Non Conformance Report

  • Record any Non Conformances. Any non-conformances must also be noted on non-conformance register

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.