Information
-
Audit Title
-
ORB - Downtown Crossing - Section 1
-
Prepared by:
-
Date
CONCRETE POUR PREPARATION
Equipment
-
Adequate Water Supply
-
Operable Generator(s) and Fuel
-
Vibrator(s) and Backup
-
Finishing Tools
-
Approved Curing Compound for Structure
-
Sprayer or Pump System for Curing Compoud
-
Plastic
-
Burlap (If new has to be soaked for a MINIMUM of 24 hours prior to use)
-
Tremmie (If more than a 5' drop concrete must be delivered via tremmie)
-
Concrete Delivery Method
CONCRETE DATA
Concrete Information:
-
Pour Start Date & Time:
-
Pour End Date & Time:
-
Contractor(s):
- Advance Concrete
- American Concrete
- Allied Concrete
- Ernst Concrete
- IMI Concrete
-
Delivery Method
- Pump
- Crane and Bucket
- Truck & Chutes
-
Location(s):
-
Estimated Volume (cu yd):
-
Actual Volume (cu yd):
-
Epoxy Bonding Agent Required:
-
Is The Mix Design Approved?
-
Mix Design Class:
- Class A
- Class AA
- Class A - Mod
- Class B
- Class M - 1
- Class P
- DT100 - 10,000
- DT80 - 8,000
- DT61 - 6,000
- DT51 - 5,000
- DT50 - 5,000
- F - 55 -45
- Flowable Fill
-
KYTC Mix Design Number:
-
Temperature Control:
-
Fly-Ash:
-
Retarder:
-
Percentage Used:
- 1%
- 2%
- 3%
- 4%
- 5%
- 6%
- 7%
- 8%
-
##8 Stone:
-
Notes:
-
Foreman/Superintendent
-
WCC - QC Engineer
CONCRETE CURING
Concrete Curing
-
What Curing Method Was Used?
-
How Were Cylinders Cured?
-
Add media
-
Notes:
TEST RESULTS
TESTING RESULTS
-
Test
-
Was a sample taken?
-
Number of Cylinders:
-
Cylinder Identification:
-
Sample Location:
-
Truck Number:
-
Ticket #:
-
Slump:
-
Air:
-
Concrete Temp:
-
Ambient Temp:
-
Add media
-
Notes:
THERMAL MONITORING
Thermal
-
Temperature Probes Installed?
-
Number of Probes Installed?
-
Probe Location(s):
-
Add media