Floor:
-
Area:
-
Room/Corridor
Condensate Drain Piping
-
Sizing verified per contract and shop drawings?
-
Slope is verified per contract and shop drawings
-
All piping and fittings are installed Plumb and square?
-
Clean outs are installed as shown?
-
Brazing or soldering has been visually inspected?
-
Dissimilar Metals have been isolated?
-
Picture of dissimilar metal isolation
-
Piping has been hydro tested per spec?
-
Inspection drawings are up to date and signed?
-
Connection to equipment and trap depths are per manufacturers installation manual?
-
Stub outs to lavatories are at the correct height?
Condensate Hangers
-
Hangers installed at Location/Spacing per spec?
-
Hanger size and model per submittal?
-
Vertical hanger rods are plumb?
-
All hanger rod nuts and cross bolts are tight?
-
Seismic/Sway bracing installed as required?
-
Pictures of seismic/sway bracing
-
Inserts and shields are installed as required?
-
Pictures of inserts and shields
In Wall Strapping
-
Piping secured per spec and is not loose?
-
Pictures of strapped pipe
-
Dissimilar metals have been isolated?
-
Pictures of dissimilar metal isolation
-
All stub outs are secure?
-
Pictures of secured stub outs
-
All stub out heights have been verified?
-
Riser clamps are installed as required?
-
Picture of riser clamp
-
Fixture backing is installed as required?
Condensate Insulation
-
Insulation installation complete per spec?
-
Shields and inserts installed if required?
-
Fire sound caulking is installed correctly
-
Labels installed and directional arrows are correct.
Notes, Impacts, or Comments
-
Notes, Impacts, or Comments
-
Signature of report preparer