iAuditor Mobile App Preview

Safe Work Method Statement

SWMS Details

Brief description of Work Activity

High-risk Construction Work

Employer/Contractor

Personnel Responsible for Monitoring this Activity

Codes of Practice / Standards Consulted

Assumptions

Details of Maintenance Checks Required for this Activity

Review date

Reviewer's signature
Work Activity Breakdown

Break the work activity down into steps below by clicking '+' and provide the possible associated hazards and its control measures.

Work Method

Work Method Description

Possible Hazards

Hazard

Risk Level

Control Measures

Person Responsible (to ensure management that this method is applied)

Sign Off

We the undersigned, confirm that the SWMS nominated above has been explained and its contents are clearly understood and accepted, we have been given the opportunity to have input and make suggestions if required. We also confirm that our required qualifications to undertake this activity are current and we are fit for duty having adequate rest and we are not under the influence of drugs or alcohol. We also clearly understand the controls in this SWMS must be applied as documented; otherwise, work is to cease immediately.

Worker signatures
Add signature

Construction Safe Work Method Statement (SWMS) Checklist

Created by: SafetyCulture Staff | Industry: General | Downloads: 114

A Safe Work Method Statement (SWMS) is a document that outlines high-risk construction work activities, hazards associated with the activity, and the control measures in place to manage these risks. SWMS is required before performing any high-risk construction work to ensure safety and proper implementation of standard operating procedures.

Signup for a free iAuditor account to download and edit this checklist. It will be added to your free account and you will be able to conduct inspections from your mobile device.

Download and edit this free checklist

Browse for other checklists


iauditor logo

The World's #1 Cloud-Based Inspection Software and App

chevron logo
coles logo
emirates logo
overground logo
tesla logo
toyota logo

Safe Work Method Statement

SWMS Details

Brief description of Work Activity

High-risk Construction Work

Employer/Contractor

Personnel Responsible for Monitoring this Activity

Codes of Practice / Standards Consulted

Assumptions

Details of Maintenance Checks Required for this Activity

Review date

Reviewer's signature
Work Activity Breakdown

Break the work activity down into steps below by clicking '+' and provide the possible associated hazards and its control measures.

Work Method

Work Method Description

Possible Hazards

Hazard

Risk Level

Control Measures

Person Responsible (to ensure management that this method is applied)

Sign Off

We the undersigned, confirm that the SWMS nominated above has been explained and its contents are clearly understood and accepted, we have been given the opportunity to have input and make suggestions if required. We also confirm that our required qualifications to undertake this activity are current and we are fit for duty having adequate rest and we are not under the influence of drugs or alcohol. We also clearly understand the controls in this SWMS must be applied as documented; otherwise, work is to cease immediately.

Worker signatures
Add signature