Construction Site Safety Inspection Checklist

  • There is a copy of the Construction Safety Management Plan available on site?

  • There are records of inductions for all employees, contractors and sub-contractors

  • Emergency procedures and contacts are readily available and posted in site offices

  • First aid facilities are available, including first aid kits and trained first aid officers

  • Fire Extinguishers are tested and well signed

  • Workers on site are observed to be wearing all required personal protective equipment

  • Work site is generally clean and tidy with minimal rubbish/refuse laying around

  • Power leads on site are tested with current tags in place

  • There are safe work method statements and risk assessments for working at heights

  • There is evidence that scaffolding is erected by competent persons (ie. certificate/tag)

  • There is no obvious damage to ladders or other steps and equipment

  • There are safe work method statements and risk assessments for asbestos work

  • Work method statements do NOT allow asbestos cutting with power equipment

  • There is a list/register or all substances being used on site

  • Material Safety Data Sheets are available for hazardous substances and dangerous goods

  • All energy sources including electricity, water and air are isolated

  • Locks are fitted as part of isolation procedures by all stakeholders

  • There are safe work method statements and risk assessments for confined spaces

  • Where there are workers in a confined space, observers are present

  • There are safe work method statements for working near identified services

  • There is evidence that buried services have been identified prior to excavation

  • There are safe work method statements and risk assessments for work near traffic

  • There are work zone traffic management plans in place when working near roads

  • Traffic management plans include safety of pedestrians

  • There is a process for managing plant (excluding hand tools)

  • There is evidence that daily inspections are carried out on load shifting plant

  • There is evidence that plant operations have appropriate licenses or training

  • There are safe work method statements and risk assessments for working over water

  • All people woking over water are required to wear personal floatation devices

  • There are safe work method statements and risk assessments for excavation work

  • Shoring, benching or battering is being used where excavations are over 1.5 metres deep

  • Contractor Representative / Position

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.