Title Page
-
Site conducted
-
Date
-
Contractor Type
-
Other:
-
Contractor:
-
Job or Ad-hoc?
-
Client / Site:
-
Prepared by:
-
Contractor Type
-
Other:
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have all operatives signed onto the RAMS?
Operatives
-
Is all operative training available on site?
-
Is training still valid?
-
Are operatives wearing the required harness and lanyards?
-
Is evidence of harness and lanyard formal inspections available?
Site
-
Has the contractor received appropriate induction by NSS/the client or another contractor?
-
Are materials being loaded/unloaded and stored in a safe manner?
-
Are plant and equipment suitable for the works?
-
Is safety signage in place on site to indicate slips, trips and falls and working at height?
-
Where applicable - is traffic management adequate for the task?
-
Where applicable - are statutory inspections current with instant evidence available when requested?
-
Where applicable - is the sub-contractor maintaining good communication with NSS and other interested parties?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works and NSS/client expectations?
-
Is the contractor leaving site conditions in a tidy and safe manner?
Emergency Provisions
-
Where applicable - have emergency rescue procedures been put in place?
-
Where applicable - have arrangements for first aid been arranged?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Was relevant training certificates been provided?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Have NSS received any positive or negative feedback regarding the contractor?
-
Is the work area free from poor condition or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Does the contractor appear to have left the site conditions clean, tidy and safe?
-
Contact the contractor immediately and inform QHSE
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have all contractors signed onto the RAMS?
Operatives
-
Is all training available on site?
-
Is training still valid?
-
Where applicable - are contractors wearing the required harness and lanyards?
-
Where applicable - is evidence of harness and lanyard formal inspections available?
Site
-
Has the contractor received appropriate induction by NSS/the client or another contractor?
-
Are materials being loaded/unloaded in a safe manner?
-
Are plant and equipment suitable for the works and fit for purpose?
-
Is safety signage in place on site to indicate slips, trips and falls while scaffolding is being erected?
-
How is the scaffolding accessed?
-
Have any specific requirements been met where applicable including pedestrian walkways, access restrictions on tie locations, mechanical handling aids including hoists and any other not mentioned?
-
Where applicable - has the contractor installed appropriate sheeting or netting?
-
Are ground conditions or supporting structure suitable?
-
If works are complete; is a handover certificate available where applicable? If no, please add details.
-
Has a documented inspection of the scaffolding taken place and can the contractor evidence this?
-
Where applicable - is there an in-date scaff tag present (minimum 7 days)?
-
Is the contractor maintaining good communication with NSS and other interested parties?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works and NSS/client expectations?
-
Is the contractor leaving site conditions in a tidy and safe manner?
-
Does the scaffold structure adequately protect from falling objects? Toeboards installed, no gaps etc.
Emergency Provisions
-
Where applicable - have emergency procedures been put in place?
-
Where applicable - have arrangements for first aid been arranged?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Have relevant training certificates been provided?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Is the work area free from poor condition or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Have NSS received any positive or negative feedback regarding the contractor?
-
Does the contractor appear to have left the site conditions clean, tidy and safe?
-
Contact the contractor immediately and inform QHSE
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Is there evidence on-site of a post erection inspection by a competent person (written or scaff tag)?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
Are plant and equipment suitable for the works with no defects?
-
Is the contractor leaving site conditions in a tidy and safe manner?
-
Does the scaffold structure adequately protect from falling objects? Toeboards installed, no gaps etc.
-
Are ground conditions or supporting structure suitable?
-
How is the scaffolding accessed?
-
Have any specific requirements been met including pedestrian walkways, access restrictions on tie locations, mechanical handling aids including hoists?
-
If works are complete; is a handover certificate available where applicable? If not yet complete, who will the certificate be sent to?
-
Where applicable - is there an in-date scaff tag present?
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements and anchor point selection?
-
Have all operatives signed onto the RAMS where applicable?
Operatives
-
Is there a level 3 rope access supervisor on-site?
-
Is the level 3 rope access supervisor first aid trained?
-
Are rope access technicians IRATA trained and can they evidence current training on-site?
-
Is there evidence of a daily check being complete each day to assess risk and document daily briefings?
Site
-
Has the contractor received appropriate induction by NSS/the client or another contractor?
-
Are materials being loaded/unloaded and stored in a safe manner?
-
What anchor point is being utilised?
- Eyebolt
- Deadweight
- Mobile Anchor
- Unquestionable Anchor
- Suspended Access Equipment Track
- Other
-
Have suspended access equipment been subject to a change of works process prior to use and can evidence be obtained to confirm suspended access equipment can be used as a rope access anchor point?
-
Have unquestionable anchors been deemed unquestionable by the level 3 rope access technician?
-
Where applicable can the contractor supply evidence of statutory inspections under LOLER for anchor points used?
-
Are access and egress routes to rigging areas safe?
-
Where applicable - has a suitable exclusion zone been erected beneath the point of works?
-
Has all rope access kit been subject to a 6 monthly recorded inspection by a competent person?
-
Are the sub-contractors maintaining good communication with each other, with NSS and other interested parties?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works including the anchor point selection and NSS/client expectations?
-
Is the contractor leaving site conditions in a tidy and safe manner?
Emergency Provisions
-
Have effective emergency rescue procedures been put in place?
-
Have arrangements for first aid been arranged?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Was relevant training certificates provided appropriate to the task?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Is the work activity free of unsafe conditions or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Have NSS received any positive or negative feedback regarding the contractor?
-
Does the contractor appear to have left the site conditions clean and tidy?
-
Contact the contractor immediately and inform QHSE
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have all operatives signed onto the RAMS?
Contractor
-
Is the contractor F-Gas trained and can they provide evidence of current training?
-
Is training still valid?
-
Is the contractor trained to use the required access equipment where applicable (i.e ladders / mobile tower / podium)?
Site
-
Has the contractor received appropriate induction by NSS/the client or another contractor?
-
Are materials being loaded/unloaded and stored in a safe manner?
-
Are plant and equipment suitable for the works?
-
Is safety signage in place on site to indicate slips, trips and falls during works?
-
If works are complete; is a handover certificate available where applicable? If not yet complete, who will the certificate be sent to?
-
Where applicable - are statutory inspections for access equipment current with instant evidence available when requested?
-
Is the sub-contractor maintaining good communication with NSS and other interested parties?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works and NSS/client expectations?
-
Is the contractor leaving site conditions in a tidy and safe manner?
-
Can the contractor provide evidence of safe waste removal of defective potentially hazardous parts?
-
Does the contractor carry an appropriate waste carriers license?
Emergency Provisions
-
Have emergency rescue procedures been put in place?
-
Have arrangements for first aid been arranged?
-
Have emergency spillage procedures been put in place?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Was relevant training certificates been provided?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Is the work area free of unsafe conditions or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Does the contractor appear to have left the site conditions clean and tidy?
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
If works are complete; is a handover certificate available where applicable? If not yet complete, who will the certificate be sent to?
-
Can the contractor provide evidence of safe waste removal of defective potentially hazardous parts?
-
Does the contractor carry an appropriate waste carriers license?
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have all contractors signed onto the RAMS?
Contractors
-
Where applicable is all operative training available on site?
-
Is training still valid?
Site
-
Is waste being handled in a safe manner with appropriate access and egress?
-
Is the waste receptacle appropriate for the type of waste being removed in line with NSS requirements and in good condition free from defects?
-
Has the waste receptacle been placed in an appropriate area which is weight bearing with necessary agreement in place by NSS/and or the client?
-
Has the contractor provided a completed consignment note upon removal with all relevant sections complete?
-
Does the contractor have an appropriate waste carriers license?
-
Does the contractor have 14001 or similar accreditations?
-
Is the waste receptacle in good condition with no signs of misuse?
-
Is the sub-contractor maintaining good communication with NSS and other interested parties?
-
Where applicable - has hazardous waste been removed compliantly, restricting access to unauthorised persons
-
Have NSS complied with sub-contractor requirements, and have NSS placed agreed waste products in the waste receptacle only?
-
Is the receptacle and surrounding area free of pest harbourage?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works and NSS/client expectations?
-
Is the contractor leaving site conditions in a tidy and safe manner?
Emergency Provisions
-
Have emergency rescue procedures been put in place?
-
Have arrangements for first aid been arranged?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Was relevant training certificates been provided?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Is the area free of unsafe conditions or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Does the contractor appear to have left the site conditions clean, tidy and safe?
-
Contact the contractor immediately and inform QHSE
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
Has the contractor provided a completed consignment note upon removal with all relevant sections complete?
-
Does the contractor have an appropriate waste carriers license?
-
Is the waste receptacle free of any evidence of misuse?
-
Where applicable - is access to hazardous waste restricted to unauthorised persons
-
Have NSS complied with sub-contractor requirements, and have NSS placed agreed waste products in the waste receptacle only?
-
Is the waste receptacle free of evidence of pest harbourage inside or nearby?
-
Is the area free of potential damage caused by the waste removal or delivery?
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements including electrical works in hazardous areas?
-
Have all contractors signed onto the RAMS?
Contractors
-
Are contractors who operate/maintain electrical equipment trained for the voltage class equipment they operate and maintain?
-
Is training still valid?
-
Are contractors competent to use any access equipment required to gain access to the point of works?
Site
-
Has the contractor received appropriate induction from NSS/the client or another contractor?
-
Are materials being loaded/unloaded and stored in a safe manner?
-
Can the contractor access the point of works safely and has any access equipment been subject to a documented statutory inspection?
-
Have test equipment such as multi-metres, RCD performance testers, earth loop testers, voltage testers, insulation resistance testers and similar instruments been functionally tested and inspected at set intervals?
-
Has testing equipment been calibrated in the last 12 months and can the contractor provide evidence of this either on the equipment or a certificate of conformity?
-
Does the contractor have visibility of an updated electrical equipment register?
-
Does the contractor have access to local electrical diagrams, drawings and procedures?
-
Has power been isolated where possible and tested to ensure full isolation of the working area has been achieved?
-
Is the contractor PPE and clothing used for electrical work free from metal materials?
-
Is the point of works dry with good lighting conditions?
-
Is the sub-contractor maintaining good communication with NSS and other interested parties?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works and NSS/client expectations?
-
Is the contractor leaving site conditions in a clean tidy and safe manner?
Emergency Provisions
-
If applicable - have emergency rescue procedures been put in place?
-
Have arrangements for first aid been arranged including CPR?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Was relevant training certificates been provided?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Is the work area free from poor condition or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Have NSS received any positive or negative feedback regarding the contractor?
-
Does the contractor appear to have left the site conditions clean and tidy?
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
Onsite/Offsite?
RAMS
-
Are the RAMS available on site?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have all operatives signed onto the RAMS where applicable?
Operator
-
Does the operator hold the relevant license to use this MEWP?
-
Is the training still valid?
-
Is the operator wearing the required harness and lanyards where applicable?
-
Does the operator have evidence of harness and lanyard 6 monthly formal inspections available?
Site
-
Has the contractor received an appropriate induction by NSS/the client or another contractor where necessary?
-
Is the MEWP being loaded/unloaded, manoeuvred into position and stored in a safe manner?
-
Is the MEWP suitable for the works?
-
Is suitable safety signage / exclusion zone in place on site to indicate slips, trips and falls and working at height?
-
Where applicable - is traffic management adequate for the task?
-
If a road closure permit has been organised - can the operator evidence this has been actioned in accordance to road closure instructions?
-
Has the operator completed a documented thorough pre-use check on the MEWP including function checks?
-
Has the LOLER thorough inspection been undertaken within the last 6 months, and is the LOLER certification held with the machine?
-
Is the operator maintaining good communication with NSS and other interested parties?
-
Are ground conditions suitable for the machine and have all associated hazards been identified with suitable control measures in place?
-
Is the contractors time keeping in line with NSS/client expectations?
-
Is the contractor work being carried out in line with safe systems of works and NSS/client expectations?
-
Is the contractor leaving site conditions in a tidy and safe manner?
Emergency Provisions
-
Have emergency rescue procedures been put in place?
-
Have arrangements for first aid been arranged?
-
Are there spillage arrangements in place and a adequate spill kit?
-
Are suitable arrangements in place in the event of a fire?
RAMS
-
Have a set of RAMS been provided?
-
Do the RAMS adequately describe the safe working arrangements?
-
Have the RAMS been reviewed and approved by the contract manager?
Operatives
-
Was relevant training certificates been provided?
-
Is training still valid?
-
Where applicable, have operative harness and lanyard certificates been provided?
Site
-
Do works appear to have been undertaken safely?
-
Does the contractor work meet NSS/client expectations?
-
Is the work area free from poor condition or hazards identified which may have been a result of contractor activities?
-
Contact the contractor immediately and inform QHSE
-
Was the MEWP appropriate for the task?
-
Have NSS received any positive or negative feedback regarding the contractor?
-
Does the contractor appear to have left the site conditions clean and tidy?
-
Has the contractor completed all required reports, inspections and handover details to the required standard in a timely manner?
-
Did the contractor carry out the works in a timely manner following agreed arrangements and timelines?
-
Where applicable - was traffic management adequate for the task?
-
Did the operator complete a documented thorough pre-use check on the MEWP including function checks?
-
Did the LOLER thorough inspection take place within the last 6 months, and was the LOLER certification held with the machine?
-
Were ground conditions suitable for the machine and have all associated hazards been identified with suitable control measures in place?
-
Were there any malfunctions or breakdowns with the MEWP either on route to the point of works or during works? If so please provide details.
Additional Information
-
Comments:
-
Photos: