Title Page

  • Conducted on

  • Prepared by

  • Location
  • Personnel to be Audited

  • Is a permit to work required for this site

  • Has the permit been signed by all required personnel

  • Arrange for Permit to work to be reviewed and signed where required

  • Safe working environment with safe access and egress for engineers

  • Stop works and take photos of the Hazards. All works put on hold until Hazard is removed or mitigated.

  • Signed Risk assessment and Method statement in place and available for review

  • Stop all works until RAMS are available

  • Are the RAMS task appropriate

  • Update RAMS to specific task

  • Are the RAMS being worked to as detailed

  • Stop works and review RAMS for the task with all engineers and ensure the information is understood and will be complied with at all times.

  • Is the Correct PPE being worn as per site policy and RAMS?

  • Stop works and obtain correct PPE prior to resuming works

  • Working area being kept clean and tidy (clean as you go policy)

  • Stop works and arrange for adequate waste storage to be supplied

  • Has correct lifting equipment been supplied for any Manual Handling Task

  • Stop works and discuss what equipment is required. Can correct equipment for task be supplied

  • If correct lifting equipment cannot be supplied a suitable method must be discussed and agreed with management team and EHS

  • Are adequate signage and exclusion zones in place for identifiable Hazards

  • Stop works and identify what signage or exclusion zones are required and arrange for this to be put in place prior to works commencing

  • Is LOTO required for these works

  • Is appropriate LOTO equipment available and being used (personal lock, lock box etc)

  • Have all energy sources be identified and LOTO applied

  • Are insulated tool being used for works which involve live batteries

  • Stop works and have engineer replace tools with suitably insulated replacements

  • Where required have the safety links been removed from any battery string where works are being carried out

  • Stop works and have suitably trained engineers remove safety links where required

  • Is there any working at height involved with these works

  • Have the RAMS suitably covered working at height procedures and have all fall protection measures been implemented

  • Stop all works and revise RAMS and protection measure to ensure safe working

  • Where applicable list test equipment being used and request serial number and calibration certification

Signature section

  • Eaton Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.