Title Page
-
Conducted on
-
Prepared by
-
Location
-
Personnel to be Audited
- Battery Engineers
- DC Engineers
- Battery Monitoring System Engineers
- Eaton Field Service Engineers
- Load Bank Engineers
- Site Supervisor
- Battery Tripping Unit installation
- AC Engineers
- Busbar Installers
- Other
-
Is a permit to work required for this site
-
Has the permit been signed by all required personnel
-
Arrange for Permit to work to be reviewed and signed where required
-
Safe working environment with safe access and egress for engineers
-
Stop works and take photos of the Hazards. All works put on hold until Hazard is removed or mitigated.
-
Signed Risk assessment and Method statement in place and available for review
-
Stop all works until RAMS are available
-
Are the RAMS task appropriate
-
Update RAMS to specific task
-
Are the RAMS being worked to as detailed
-
Stop works and review RAMS for the task with all engineers and ensure the information is understood and will be complied with at all times.
-
Is the Correct PPE being worn as per site policy and RAMS?
-
Stop works and obtain correct PPE prior to resuming works
-
Working area being kept clean and tidy (clean as you go policy)
-
Stop works and arrange for adequate waste storage to be supplied
-
Has correct lifting equipment been supplied for any Manual Handling Task
-
Stop works and discuss what equipment is required. Can correct equipment for task be supplied
-
If correct lifting equipment cannot be supplied a suitable method must be discussed and agreed with management team and EHS
-
Are adequate signage and exclusion zones in place for identifiable Hazards
-
Stop works and identify what signage or exclusion zones are required and arrange for this to be put in place prior to works commencing
-
-
Is LOTO required for these works
-
Is appropriate LOTO equipment available and being used (personal lock, lock box etc)
-
Have all energy sources be identified and LOTO applied
-
Are insulated tool being used for works which involve live batteries
-
Stop works and have engineer replace tools with suitably insulated replacements
-
Where required have the safety links been removed from any battery string where works are being carried out
-
Stop works and have suitably trained engineers remove safety links where required
-
Is there any working at height involved with these works
-
Have the RAMS suitably covered working at height procedures and have all fall protection measures been implemented
-
Stop all works and revise RAMS and protection measure to ensure safe working
-
Where applicable list test equipment being used and request serial number and calibration certification
Signature section
-
Eaton Representative