Title Page

  • Conducted on

  • Select site

  • Prepared by

  • Location
  • Contractor name

  • Reported to

Pre-start works H&S Documentation

  • Were documentation checks carried out during this visit?

  • Has the point of work Risk Assessment being completed and signed by all involved?

  • Have operatives read and signed the appropriate RAMS for the works?

  • Have operatives received a site induction and signing in on a daily basis?

  • Are all permits in place for the works being completed i.e. to dig or confined space entry?

Streetworks and site set up

  • Complete this section for all site visits

  • Has the traffic management system been set up in accordance with New Roads Street Works Act?

  • Site Personnel are in possession of up to date Street Works tickets (supervisor - operative)?

  • Are the working areas being well managed with good housekeeping being maintained?

  • Are the contractors Information boards displayed at each end of the working areas along with the permit number?

  • Are the correct size signs / barriers / cones for the speed of road and all plant and equipment placed within the barriers?

  • Are pedestrian walkways compliant with the NRSWA (minimum width requirements (1.5m) absolute minimum 1m).

  • Are suitable measures in place to ensure residents are able to access / egress their properties safely and without risk of damaging vehicles?

  • Is the working area suitably segregated to ensure operatives and public safety is provided?

  • Sandbags available and used effectively.

Plant & Equipment

  • Are there items of plant or equipment being used?

  • Is the Plant and Equipment (including safety guards) in good condition and suitable for the work?

  • Are vehicles and plant fitted with fully functional amber flashing beacons

  • Are Operatives trained and competent to operate the plant / equipment and hold the relevant CPCS or NPORS qualifications?

  • Are daily plant checks being completed with weekly checks recorded on the PUWER register?

Welfare / First Aid

  • Were the welfare facilities and first aid provisions checked during this visit.

  • Does each gang have a suitably sized First Aid, Eye Wash and Burns kit?

  • Is there a suitably qualified first aider on site?

  • Are operatives wearing the required PPE as per the site rules and RAMS?

  • Are there suitable washing facilities available such as sterile hand wipes and sanitiser (COVID-19)?

  • Are Toilet Facilities or details of the nearest Toilet Facilities provided?

  • Is there an adequate supply of drinking water?

Work at Height - MEWP's - Ladders

  • Are any works taking place which involves working at height via MEWPS or Ladders?

  • Has a Permit to climb been completed (suitable pre climb check)

  • Are Safety Harnesses being worn and in good condition ?

  • Evidence of appropriate LOLER inspection undertaken (6 Months)

  • Have operatives working at height received the relevant training for the type of work undertaken?

  • Are operatives required to operate MEWP's?

  • Do operatives have an up to date IPAF ticket?

  • Is there available an up to date thorough examination certificate (6 monthly).

  • Are daily pre use checks being completed?

  • Does the machine look to be in good serviceable condition.

  • Are ladders being used?

  • Are ladders used in good condition and of a class 1 design (EN131)?

  • Have the ladders been correctly secured in accordance with SA001 and Tetra to prevent displacement?

  • Work at height being undertaken in accordance with BT and WPD safety controls

  • Emergency rescue plan in place and suitable equipment and training provided?

Environmental

  • Were Environmental checks completed during this visit

  • Are there any areas of concern in which works could have an impact on the local environment such as noise, dust, vibration, fuel spills or silt / contaminated water run off?

  • Are arrangements in place to contain any fuel spills or oil leaks such as suitably sized spill kits, fuel bunds or trip trays?

Working within inspection Chambers

  • Are operatives required to work within inspection chambers (confined space)

  • Is there available a gas detector with an up to date calibration certificate?

  • Has the underground network been gas tested and chamber opened correctly

  • Where the risk assessment denotes the chamber as being a confined space, has the confined space permit been completed?

  • Are operatives confined space trained? and is the required rescue equipment provided?

  • Has the chamber been suitably guarded to protect operatives and members of the public against falls from height?

  • Have the cables been secured correctly (both the installation cables and pre-installed cables)

  • Have the cables been labelled correctly

  • Is the chamber clear of rubbish

  • Are the team aware of risk from leptospirosis and taking suitable controls.

  • Are the team aware of the risk of discarded used syringes and have the equipment to deal with them.

Subduct and Blowing Operations

  • Are works taking place involving Subduct and Blowing operations?

  • Has all the blowing equipment been PAT tested and has been checked by the operative that is in good working order and is safe to use.

  • Are operatives trained and competent to operate the blowing machine?.

  • Do operatives have a means of communication either 2 way radios or mobile phones to ensure they are able to effectively communicate to each other?

Rodding, Cobra and Roping Operations

  • Are Rodding and Roping works taking place?

  • Has the cobra / rods been transported and stored correctly to ensure it is safe to use.

  • Are operatives wearing suitable eye / hand protection and other appropriate PPE for this operation?

  • Are the team using the cobra equipment safely and correctly

  • Are the appropriate measures being taken to help minimise the risk of slipping and tripping hazards to both the team and members of the public?

  • Is the cobra /rods in good working order with no visible defects

Splicing Operations

  • Are splicing works taking place?

  • Has Splicing equipment been checked to ensure it is in good working order, PAT tested and safe to use.

  • Has the crew got a suitable sharps box available and being used for cut fibre?

  • Are chemicals stored and used correctly?

  • COSHH assessment and chemical safety information available including emergency response?

Other SHE issues / Good Practice not covered

  • Issues / Good Practice Observed

  • Photographs of Issue / Good Practice

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.