Attendance and ppe

  • please attach photo of weekly singing in sheets

  • Are all members of team wearing the correct ppe

  • ask Arc Site manager to toolbox talk and photo signed copy.

  • Are harness required

  • Are all harness checked and safe for use

  • Stop work from harness until the correct ppe is supplied

  • Has the correct fall arrest or fall restraint System been supplied

  • Stop work and ask for the correct ppe

  • Has a risk assessment been produced for harness use

  • Stop work until risk assessment has been amended

Scaffolding

  • Is the scaffolding safe for use

  • Don’t allow operatives on roof Ask site management to provide a safe working system for our operatives and take photos

  • Are toe boards in place to stop falling debris and materials and take photos

  • Ask site to arrange scaffolders to install

  • do the loading bays look fit for purpose

  • Ask site management to check

Materials

  • Are materials stored on roof level

  • Make sure operatives Sore materials in a safe manor protect materials from rain and ballast

  • Proof of All materials on roof

  • Make sure materials are stored in a safe manor and protected for rain

Roofing works

  • Percentage of flat roofing Complete in m2

  • Photos of all flat flooring works

  • Percentage of up stands complete

  • Photos of completes up stands

  • Number of outlets complete

  • Photos of outlets

  • Number of svp complete

  • Photos of svp complete

  • Percentage of insulation installed

  • Photos of insulation complete

  • Percentage of green roofing installed

  • Any issues holding us up

  • Do we require more materials

  • Make a list of the materials

Balconies

  • Amount of balconies complete since last audit

  • Any issues holding us up

  • State the balcony flat numbers and photos of the issues on site

  • Do we require materials

  • Make a list

Roofs balconies or green roofs about to start

  • Photos of next roof ready to start and markup on the Ariel plan

  • Do we require materials

  • Start requisition process

  • Do we have labour appointed to the task

  • Let senior contracts manager know

  • Any issues holding us up from starting on.

  • Take photos of the issues h

  • Do we require new risk assessments

  • Go through H&s pre start system in place

Completed roofs

  • Amount of left over materials

  • Are leftover materials going onto next roof ready to start

  • Make a note of all materials for collection

  • Are all materials protected stored downstairs ready for collection

  • Are all materials off roof ready for collection

  • Has the roof been leak tested

  • Does the roof require a revisit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.