Information
-
Insert Property Address:
-
Client / Site
-
Conducted on
-
Prepared by
Quality Assurance Form
QUALITY ASSURANCE FORM:
-
ALL DETAILS BELOW MUST BE COMPLETED IN FULL AND ACCURATELY:
-
DISTRIBUTION:
-
DPI Switch Installed @ Incoming Supply?
-
Blanks in Fuseboard Present -No Access to Live Parts?
-
Corsan test sticker applied to Fuseboard with circuit details completed?
-
Insert Image:
-
RCD Protection installed on EVERY Circuit?
-
Fuseboard has been neatly installed (Internal)?
-
Insert Image:
-
Trunking Installed on all cables at the Fuseboard (No cables on show)?
-
Water and Gas Bonds Accessible and on view?
-
EXTERNAL WORKS:
-
Front welcome light installed:
-
Insert Image:
-
Lights correctly functioning on dusk till dawn and PIR:
-
Lights securely fixed with correct fixings:
-
Correct engraved switches or isolator or installed:
-
Rear Security light installed:
-
Insert Image:
-
Lights correctly functioning on dusk till dawn and PIR:
-
Lights securely fixed with correct fixings:
-
Correct engraved switches or isolator or installed:
-
KITCHEN:
-
IP Rated Light Fitting Installed?
-
Insert Image:
-
Extractor Fan Installed and Tested - Blades free of Ducting?
-
Insert Image:
-
Bullet Vent Fitted Secure and Level and not overhanging external insulation:
-
Insert Image:
-
BATHROOM:
-
IP Rated Light Fitting Installed?
-
Insert Image:
-
Extractor Fan Installed and Tested - Blades free of Ducting?
-
Insert Image:
-
Bullet Vent Fitted Secure and Level and not overhanging external insulation:
-
Insert Image:
-
MISCELLANEOUS:
-
Trunking Secure and Level - Manufactured Bends Installed?
-
Cables in Loft Space Clipped and Secure - Neat and Tidy?
-
Smoke Detectors replaced? - Smoke Tests Carried Out with Artificial Spray?
-
Smoke Detector batteries replaced:
DECLARATION
-
The items above have been checked in detail and have been completed in a safe manner. I can confirm the installation is ready to hand over to the client.
-
Supervisor:
- Gavin Roscoe
- Chris Smith
- Colin Moore
- Gary Langstaff
- Kyle Martin
- Ross wilson
- Thomas Analey
- Other
-
Supervisor:
-
Please Sign:
Customer Satisfaction Form
CUSTOMER SATISFACTION FORM
-
To be completed with the tenant present:
-
Did The Engineer Arrive On Time?
-
Was The Engineer Polite And Helpful?
-
Was The Engineer Smart And Presentable?
-
Was The Job Completed To A Satisfactory Level?
-
Did The Engineer Clean Away All Debris?
-
Is Your Fridge/Freezer Plugged In And Working?
-
Please Note Any Additional Comments That You Feel May Improve Our Service:
-
CUSTOMER DETAILS:
-
Customer Name:
-
Address:
-
Please Sign Below:
Please Confirm The Fridge/Freezer Have Been Reconnected And Are Fully Functional -Corsan (Northern) Ltd Take NO Responsibility For The Fridge/Freezer.
In The Absence Of The Occupant The Installing Engineer And The Supervisor Must Confirm The Fridge /Freezer Are Connected And Working. -
Customer:
-
Supervisor: