Information
-
Document No.
-
Audit Title (INSERT - Pre Start Electrical Survey)
-
Client
-
Installation Address
-
Conducted on
-
Prepared by
-
PLEASE EMAIL THIS FORM INTO HEAD OFFICE ONCE COMPLETED:
gavin.burns@corsan.co.uk
GAVIN WILL ARRANGE A DATE OF INSTALLATION AND NOTIFY THE OCCUPANT.
OCCUPANTS DETAILS
-
Clients Name:
-
Contact Number:
-
Email Address (If Available):
SURVEY FINDINGS
-
THERE MAYBE A REQUIREMENT TO UPDATE THE EXISTING INSTALLATION BEFORE ELECTRICAL WORKS CAN PROCEED.
IF THIS IS THE CASE THEN PLEASE EXPLAIN THIS TO THE HOME OWNER AND REFER TO THE FIXED RATE CHART TO DISCUSS OPTIONS AND COSTS. -
Does the installation require RCD protection?
-
REFER TO THE FIXED RATES GUIDE AND SELECT A SUITABLE OPTION
-
Preferred RCD method
-
Insert Sub Cost (£)
-
Is the Main Water Bond Present and Correctly Sized?
-
REFER TO THE FIXED RATES GUIDE AND SELECT A SUITABLE OPTION
-
Preferred method of installation
- Clipped Direct
- 20mm PVC Conduit (White)
- 20mm PVC Conduit (Black)
- 20mm Galvanised Conduit (Black)
- 20mm Galvanised Conduit (Galv)
- YT2 Trunking
-
Insert Sub Cost (£)
-
Is the Main Gas Bond Present and Correctly Sized?
-
REFER TO THE FIXED RATES GUIDE AND SELECT A SUITABLE OPTION
-
Preferred method of installation
- Clipped Direct
- 20mm PVC Conduit (White)
- 20mm PVC Conduit (Black)
- 20mm Galvanised Conduit (Black)
- 20mm Galvanised Conduit (Galv)
- YT2 Trunking
-
Insert Sub Cost (£)
-
Does the Work need Notifying to Building Control (Part P)?
-
PLEASE INFORM THE OFFICE OF THE NOTIFICATION ENSURING THE CORRECT DETAILS ARE SUPPLIED.
NOTIFICATION IS COMPLETED BY THE ADMINISTRATION TEAM VIA THE NICEIC WEBSITE.
SURVEY SUMMARY
-
Insert Total Cost of Remedial Works (£)
-
When would you suggest the remedial works are to be completed?
-
Provide preferred installation date
-
Please tell us of any special requirements or issues that may allow the remedial works to be completed efficiently.
Issue
-
Description of the potential issue or special instruction:
-
Insert Image
TO BE COMPLETED BY THE HOME OWNER
-
BY SIGNING THIS REPORT YOU ARE AGREEING TO THE RATES ABOVE, PLEASE SELECT A PAYMENT METHOD FROM THE OPTIONS BELOW.
PAYMENT MUST BE MADE UPON COMPLETION OF THE WORKS.
YOUR CERTIFICATE WILL BE SENT VIA EMAIL IF PREFERRED OR ALTERNATIVELY BY POST.
YOUR PART P CERTIFICATE WILL BE SENT VIA ROYAL MAIL DIRECT FROM THE NICEIC, THIS WILL ARRIVE APPROXIMATELY 2 WEEKS AFTER INSTALLATION.
BY SIGNING THIS FORM YOU ARE CONFIRMING THAT YOU ARE SATISFIED WITH THE RATES AND AGREE TO THE TERMS OF THIS SALE. -
How would you like to pay?
-
PLEASE NOTE:
PAYMENT IS NOT REQUIRED UNTIL COMPLETION OF THE WORKS. -
Print & Sign:
-
You will contacted in the next few days to arrange the installation date unless it has been agreed your remedial works will be completed on the day of your boiler electrics.
In some instances we will aim to have the remedial works completed before your boiler is installed, if the redial works are small in size they will be completed on the day your electrics to your boiler are completed.