THIS SURVEY IS TO BE COMPLETED BEFORE THE HEALTH & SAFETY SITE FOLDER IS CREATED FOR LARGER PROJECTS.
THIS SURVEY MUST BE USED TO HELP COMPILE AN ACCURATE AND DETAILED SITE HEALTH & SAFETY FOLDER.
THIS SURVEY IS TO BE SITE SPECIFIC AND MUST BE COMPLETED ON SITE PRIOR TO ATTEMPTING THE CREATION OF THE HEALTH & SAFETY FOLDER.
THIS SURVEY IS TO BE ADDED TO THE HEALTH & SAFETY FOLDER.
INSTALLATION DETAILS
-
Assessment Carried Out By:
- Colin Moore
- David Burns
- Gavin Burns
- Paul Carrick
- Andrew Shelton
- Mark Dannatt
- Craig Marshall
-
Date:
-
Site Location:
-
Description of Works to be Carried Out:
RISK ASSESSMENT
-
REFER TO THE LIST BELOW SELECTING THE AREAS WHICH MAY BE A RISK.
ONCE A SELECTION HAS BEEN MADE YOU MUST WRITE IN DETAIL THE POTENTIAL RISKS ASSOCIATED WITH THE ITEM SELECTED. -
RA001 - Asbestos
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA002 - Brick / Block Work
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA003 - Cartridge Operated Fixing Tools
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA004 - Confined Spaces
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA005 - Demolition
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA006 - Driving at Work
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA007 - Dust & Fumes
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA008 - Excavations
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA009 - Excavators
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA010 - Falling Objects
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA011 - Fire & Explosion
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA012 - Fork Lift Trucks
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA013 - Fragile Roofs
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA014 - Gin Wheels
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA015 - Hand Tools
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA016 - Working at Heights
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA017 - Highways
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA018 - Hot Works
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA019 - Industrial Roofs
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA020 - Violent / Dangerous Occupants
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA021 - Ladders
-
WARNING - CERTAIN SITES WILL NOT ALLOW WORKING AT HEIGHTS VIA LADDERS.
CONFORM WITH THE CLIENT IF LADDERS ARE ACCEPTABLE.
MAKE CONSIDERATIONS FOR TRAINING AND HARNESS'S. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA022 - Lifting Gear
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA023 - Lone Working
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA024 - LPG
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA025 - Machinery
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA026 - Manual Handling
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA027 - Mobile Elevated Platform Works
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA028 - Mobile Cranes
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA029 - Mobile Masts
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA030 - Mobile Plant
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA031 - Noise at Work
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA032 - Openings
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA033 - Overhead Power Lines
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA034 - Breaking into Pipelines
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA035 - Pneumatic Tools
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA036 - Portable Electric Appliances
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA037 - Public On-Site
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA038 - Site Staff
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA039 - Scaffolding
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA040 - Sharpe Edges, Nails etc.
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA041 - Slips Trips & Falls
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA042 - Vulnerable Persons
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA043 - Step Ladders
-
WARNING - CERTAIN SITES DO NOT ALLOW USE OF STEP LADDERS.
IF THIS IS THE CASE HOP-UPS MUST BE USED. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA044 - Tower Cranes
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA045 - Tower Scaffolds
-
WARNING - IT IS A MANDATORY REQUIREMENT THAT ONLY PERSONNEL WITH PASMA TRAINING WORKS WITH TOWER SCAFFOLDING.
IT IS ACCEPTABLE FOR THE TOWER TO BE ERECTED BY A PASMA TRAINED OPERATIVE FOR OTHERS TO USE. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA046 - Underground Services
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA047 - Vibration
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA048 - Core Cutting
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA049 - Young Persons
-
WARNING - AUTHORISATION IS REQUIRED BY THE PARENT OR GUARDIAN IN WRITING CONFIRMING THE INDIVIDUAL HAS PERMISSION TO ATTEND SITE.
A COPY OF THE LETTER IS TO BE INSERTED INTO THE SITE HEALTH & SAFETY FOLDER AND EMAILED DIRECT TO THE CLIENT. -
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
-
RA050 - Electricity
-
Detail the Risk(s) Identified:
-
Give Detail of how to Limit, Reduce or Remove the Risk:
-
If the Above Restrictions are in place Is it Safe to Proceed?
METHOD STATEMENT
-
A DETAILED DESCRIPTION OF HOW THE WORKS ARE TO BE COMPLETED MUST BE NOTED BELOW.
-
Detailed Description of Method Statement:
COSHH
-
SELECT FROM THE LIST BELOW SELECTING THE AREAS WHICH MAY BE A RISK:
-
Silicon Based Products to be Used?
-
INSERT THE COSHH REPORT INTO THE HEALTH & SAFETY SITE FOLDER.
-
Will Dust be Present or Created by these Works?
-
INSERT THE COSHH REPORT INTO THE HEALTH & SAFETY SITE FOLDER.
-
Will there be a Requirement to Use Expanding Foam?
-
INSERT THE COSHH REPORT INTO THE HEALTH & SAFETY SITE FOLDER.
-
Please List any Other Hazardous Substance:
SPECIAL REQUIREMENTS
-
PLEASE DETAIL ANY SPECIAL REQUEST FROM THE CLIENT OR WHICH MAY BE A REQUIREMENT TO COMPLETE THIS PARTICULAR PROJECT
-
Please Detail any Special Requirements:
POINTS TO REMEMBER
-
All Personnel have the Correct CSCS Card?
-
All Personnel have a UKATA Asbestos Training Certificate?
-
A Plant Register has been created for the RAMS File?
-
PAT Testing of All Electrical Equipment has either been Completed prior to starting or a date has been arranged?
COMPLETED BY:
-
Print & Sign
-
PLEASE INCLUDE THIS REPORT AS PART OF THE HEALTH & SAFETY SITE FOLDER.