Title Page
-
Project name:
-
Prepared by:
-
Inspection carried out by:
-
Conducted on
Before Starting
-
Has last weeks inspection been closed out?
On Site Inspection Points Ensure the site is in compliance with legislation, Costain procedures and best practice. Consider the following: permits in place, COSHH, waste management, first aid, fire, rescue procedures, confined spaces, RAMS compliance, dewatering and drainage, PPE, mobile plant, temporary works including scaffolding, excavations, lifting equipment (LOLER), excavations and electrical equipment (PUWER).
-
Item
-
Photo of the item:
-
-
Location:
- West Abutment
- Area 1a
- Area 1b
- Area 2
- Area 3
- Area 4
- Area 5
- Area 6
- Area 7
- Area 8
- Area 9
- Area 10
- East Abutment
- Top Deck
- In Deck
- Offices & Welfare
-
Item details:
-
Closed out by time:
-
By who:
RAMS review
-
RAMS
-
RAMS no. & Title
-
what the review consisted of: