Information

  • Audit Title

  • Document No.

  • Client / Site

  • Prepared by

  • Location
  • Personnel

Permit Compliance

  • Log book / pre-starts complete

  • JHA completed and signed

  • Good to Go completed

Cranes

  • Radio communication avaliable

  • Crane configuration compliant

  • Slew path barricaded, tagged and signage

  • Christmas tree lights visible/ working

  • Outrigger timbers under jacks firm and stable

  • 2 riggers minimum for cranes over 60 tonne

  • Loads controlled / secured when traveling (Franna)

  • Adequate warning from crane before slewing (Horn)

  • No multiple loads being lifted at once

  • Personnel NOT working underneath the load

Rigging

  • Rigging gear tagged and compliant

  • Drop Zones for rigging

  • Chain-blocks / Com-A-Longs NOT back hooked

  • Correct PPE in use (Gloves,Glasses,etc)

  • Loads double wrapped

  • 16mm Tagline used on all loads

  • Maximum angle of 120 degrees

Sign off & Comments

  • Comments

  • Safety Advisor

All corrective actions must be entered into the site corrective actions register

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.