Title Page
-
Work Activity
-
Workplace/Location
-
Conducted on
-
Verifier (Name) and Signature
Verification Criteria
1. Implementation Steps – Exported Fill Material
-
Review site waste register to verify if fill material has been removed from site and if so a preliminary site investigation checklist has been completed.
-
Where the preliminary site investigation identifies a medium or high risk of contamination, check to ensure chemical analysis has been undertaken by a NATA approved laboratory to classify the fill material.
-
Verify a documented process is in place to capture the delivery location and quantity of each load of fill material.
-
Verify that an agreement is in place with each receiver of fill material.
-
Verify that Downer have a copy of the receivers local approvals to lawfully receive the fill material.
2. Implementation Steps – Imported Fill Material
-
Review local approvals to ensure Downer is able to receive fill material.
-
Review site waste register to ensure delivery receipts have been received for each load of imported fill material.
-
Check delivery dockets for the - <br> a) address of where the fill / raw material was sourced; <br> b) registration of the vehicles that transport fill; and,<br> c) driver identity.<br>
-
Verify each load of imported fill is accompanied by the generators site investigation / or chemical analysis undertaken by a NATA approved laboratory.
-
Verify every load of imported fill material is physically assessed.
-
Inspect the site to ensure the fill material is adequately contained. (erosion controls as defined within the site environmental management plan or soil and water management plan)
Critical Control Effectiveness
-
Indicate the overall level of effectiveness of the Critical Control