Information

Project Details (Completion of all of the following fields is mandatory. Forms submitted without all fields completed will not be assessed.)

  • Audit Title/Project Description

  • Design Pack ECB Link ID (eg. ABC-1234)

  • Work Parcel/Contract No.

  • Separable Portion No.

  • Order No.

  • Site Address
  • Project Manager

  • Team Manager

  • Authority Number

  • Installer Name

  • Installation Date

Section 1

Type 04 Rack

  • Photo of rack before installation of S/Rs.

  • a. Correct Rack Layout delivered eg, Layout A, B, C, etc.

  • b. No damage to rack (structural /paint /plating)

  • c. Correct Earth tree fitted

  • d. Scratches, exposed rivets covered with supplied patches

  • e. Rack installed in the correct floor position

  • f. Rack installed at the same s/structure height as adjacent racks

  • g. Rack level and plumb (check with spirit level)

  • h. Rack securely attached to superstructure or wall using correct mounting kits and earthing practices

  • i. High superstructure kit “thick washers installed below RH C-channel”. Isolation from ironwork not required.

  • j. Rack securely bolted to floor, using supplied anchors & feet set at 450 angle to frame edges

  • k. Rack correctly located over floor tiles (raised floor only)

  • l. Rack header label fitted with correct location.

  • Ref: Design Pack TM00046

  • *Mandatory photo required - Rack photo showing rack at installation

Section 2

APDP

  • a. Anderson connectors for each primary feed RF1 & RF2 cable tied to prevent accidental pulling apart

  • b. Correct alarm cable and colour code

  • c. Alarm cables terminated correctly on Krone Terminations

  • d. Alarm priority switches set to correct position

  • e. No Excessive Cable Lengths in APDP

  • f. No permanent alarms on APDP

  • g. APDP Subrack label correct size

  • h. Label subrack Position correct format

  • i. RF1 & RF2 , Fuse / Breaker Location correct format

  • j. Circuit Breaker designation for relevant subracks

  • k. Correct AI Remote alarm IDF location

  • l. AI Remote Alarm IDF labelled

  • Ref: TM 00046 A01

  • *Mandatory photo required - Close up Photo of front cover label and panel

Section 3

Rack Primary Feed Cables

  • a. Rack power cables correct size (6mm2)

  • b. Rack power cables segregated from the LOD Primary Power 150 mm2 cables

  • c. Rack power cables contained within the power tray

  • d. Cables not damaged/ against a sharp edge

  • e. Rack feed A& B fed from different s/racks/planes but same CB position (unless specified in Design Pack)

  • f. Power cable lugs crimped correctly/ securely at LOD

  • g. Heatshrink on all lugs

  • h. LOD CBs correct type and rating

  • i. LOD CBs securely fitted on “Din” rail

  • j. LOD CB Locking clip is in the “closed” position

  • k. Rack feed cables labelled at APDP end (RF1 & RF2)

  • l. Rack feed cables labelled at LOD

  • m. LOD labelled for correct CB allocation

  • Ref: CSD 26204


  • *Mandatory photo required - Photo of primary connections at distribution point

Section 4

AI REMOTE Subrack

  • a. Subrack installed in correct position as per rack layout

  • b. Correct mounting brackets used for rack type.

  • c. Power cables run correctly down RHS of rack.

  • d. Signal cables run correctly down LHS of the rack.

  • e. Subrack label location and data correct

  • f. Subrack earthed correctly

  • g. Power and earth cables correct size.

  • h. Correct ferrules used on power and earth cables.

  • i. No bare metal or wires showing on the power connector.

  • j. All cabling secured correctly to Subrack and rack

  • k. Subrack Earth cable installed correctly on Subrack and APDP.

  • Ref: TM00330_A01

  • *Mandatory photo required - Photo of AI Remote subrack

Section 5

EXPAND D Subrack

  • a. Subrack installed in correct position as per rack layout

  • b. Correct mounting brackets used for rack type.

  • c. Power cables run correctly down RHS of rack.<br>

  • d. Signal cables run correctly down LHS of the rack.

  • e. Subrack label location and data correct

  • f. Subrack earthed correctly

  • g. Power and earth cables correct size.

  • h. Correct ferrules used on power and earth cables.

  • i. No bare metal or wires showing on the power connector.

  • j. All cabling secured correctly to Subrack and rack

  • k. Subrack Earth cable installed correctly on Subrack and APDP.

  • Ref: TM00330_A01

  • *Mandatory photo required - Photo of Expand D subrack

Section 6

EXPAND F Subrack

  • a. Subrack installed in correct position as per rack layout

  • b. Correct mounting brackets used for rack type.

  • c. Power cables run correctly down RHS of rack.<br>

  • d. Signal cables run correctly down LHS of the rack.

  • e. Subrack label location and data correct

  • f. Subrack earthed correctly

  • g. Power and earth cables correct size.

  • h. Correct ferrules used on power and earth cables.

  • i. No bare metal or wires showing on the power connector.

  • j. All cabling secured correctly to Subrack and rack

  • k. Subrack Earth cable installed correctly on Subrack and APDP.

  • Ref: TM00330_A01

  • *Mandatory photo required - Photo of Expand F subrack

Section 7

RMX3200 Subrack

  • a. Subrack installed in correct position as per rack layout

  • b. Correct mounting brackets used for rack type.

  • c. Power cables run correctly down RHS of rack.<br>

  • d. Signal cables run correctly down LHS of the rack.

  • e. Subrack label location and data correct

  • f. Subrack earthed correctly

  • g. Power and earth cables correct size.

  • h. Correct ferrules used on power and earth cables.

  • i. No bare metal or wires showing on the power connector.

  • j. All cabling secured correctly to Subrack and rack

  • k. Subrack Earth cable installed correctly on Subrack and APDP.

  • Ref: TM00330_A01

  • *Mandatory photo required - Photo of RMX3200 subrack

Section 8

Opto-coupler Subrack

  • a. Subrack installed in correct position as per rack layout

  • b. Correct double height mounting brackets used for rack type.

  • c. Power cables run correctly down RHS of rack.<br>

  • d. Signal cables run correctly down LHS of the rack.

  • e. Subrack label location and data correct

  • f. Subrack earthed correctly

  • g. Power and earth cables correct size.

  • h. Correct ferrules used on power and earth cables.

  • i. No bare metal or wires showing on the power connector.

  • j. All cabling secured correctly to Subrack and rack

  • k. Subrack Earth cable installed correctly on Subrack and APDP.

  • l. Opto-coupler inset installed in correct position and ribbon cables secure

  • Ref: TM00330_A01

  • *Mandatory photo required - Photo of Optocoupler to Expand F and RMX; mount brackets and cable connections.

Section 9

AI Remote alarm IDF

  • a. IDF frame installed in correct position as per rack layout

  • b. IDF frame is secured and level<br>

  • c. IDF fully fitted. No blank block positions.

  • d. Earth strip fitted.

  • e. All cabling secured correctly to Subrack and rack

  • f. Correct colour code installed.

  • g. All wires terminated correctly.

  • h. No bare metal or wires showing.

  • g. Block designations installed and correct.

  • Ref: TM00330_A01

  • *Mandatory photo required - Photo of AI Remote alarm IDF

Completion

  • General Comments

  • This is the end of Photo Audit. Your audit result can be found under "Audits" menu. You can edit, preview and send your result via Email

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.