Information
Project Details (Completion of all of the following fields is mandatory. Forms submitted without all fields completed will not be assessed.)
-
Audit Title/Project Description
-
Design Pack ECB Link ID (eg. ABC-1234)
-
Work Parcel/Contract No.
-
Separable Portion No.
-
Order No.
-
Site Address
-
Project Manager
-
Team Manager
-
Authority Number
-
Installer Name
-
Installation Date
Section 1
Type 04 Rack
-
Photo of rack before installation of S/Rs.
-
a. Correct Rack Layout delivered eg, Layout A, B, C, etc.
-
b. No damage to rack (structural /paint /plating)
-
c. Correct Earth tree fitted
-
d. Scratches, exposed rivets covered with supplied patches
-
e. Rack installed in the correct floor position
-
f. Rack installed at the same s/structure height as adjacent racks
-
g. Rack level and plumb (check with spirit level)
-
h. Rack securely attached to superstructure or wall using correct mounting kits and earthing practices
-
i. High superstructure kit “thick washers installed below RH C-channel”. Isolation from ironwork not required.
-
j. Rack securely bolted to floor, using supplied anchors & feet set at 450 angle to frame edges
-
k. Rack correctly located over floor tiles (raised floor only)
-
l. Rack header label fitted with correct location.
-
Ref: Design Pack TM00046
-
*Mandatory photo required - Rack photo showing rack at installation
Section 2
APDP
-
a. Anderson connectors for each primary feed RF1 & RF2 cable tied to prevent accidental pulling apart
-
b. Correct alarm cable and colour code
-
c. Alarm cables terminated correctly on Krone Terminations
-
d. Alarm priority switches set to correct position
-
e. No Excessive Cable Lengths in APDP
-
f. No permanent alarms on APDP
-
g. APDP Subrack label correct size
-
h. Label subrack Position correct format
-
i. RF1 & RF2 , Fuse / Breaker Location correct format
-
j. Circuit Breaker designation for relevant subracks
-
k. Correct AI Remote alarm IDF location
-
l. AI Remote Alarm IDF labelled
-
Ref: TM 00046 A01
-
*Mandatory photo required - Close up Photo of front cover label and panel
Section 3
Rack Primary Feed Cables
-
a. Rack power cables correct size (6mm2)
-
b. Rack power cables segregated from the LOD Primary Power 150 mm2 cables
-
c. Rack power cables contained within the power tray
-
d. Cables not damaged/ against a sharp edge
-
e. Rack feed A& B fed from different s/racks/planes but same CB position (unless specified in Design Pack)
-
f. Power cable lugs crimped correctly/ securely at LOD
-
g. Heatshrink on all lugs
-
h. LOD CBs correct type and rating
-
i. LOD CBs securely fitted on “Din” rail
-
j. LOD CB Locking clip is in the “closed” position
-
k. Rack feed cables labelled at APDP end (RF1 & RF2)
-
l. Rack feed cables labelled at LOD
-
m. LOD labelled for correct CB allocation
-
Ref: CSD 26204
-
*Mandatory photo required - Photo of primary connections at distribution point
Section 4
AI REMOTE Subrack
-
a. Subrack installed in correct position as per rack layout
-
b. Correct mounting brackets used for rack type.
-
c. Power cables run correctly down RHS of rack.
-
d. Signal cables run correctly down LHS of the rack.
-
e. Subrack label location and data correct
-
f. Subrack earthed correctly
-
g. Power and earth cables correct size.
-
h. Correct ferrules used on power and earth cables.
-
i. No bare metal or wires showing on the power connector.
-
j. All cabling secured correctly to Subrack and rack
-
k. Subrack Earth cable installed correctly on Subrack and APDP.
-
Ref: TM00330_A01
-
*Mandatory photo required - Photo of AI Remote subrack
Section 5
EXPAND D Subrack
-
a. Subrack installed in correct position as per rack layout
-
b. Correct mounting brackets used for rack type.
-
c. Power cables run correctly down RHS of rack.<br>
-
d. Signal cables run correctly down LHS of the rack.
-
e. Subrack label location and data correct
-
f. Subrack earthed correctly
-
g. Power and earth cables correct size.
-
h. Correct ferrules used on power and earth cables.
-
i. No bare metal or wires showing on the power connector.
-
j. All cabling secured correctly to Subrack and rack
-
k. Subrack Earth cable installed correctly on Subrack and APDP.
-
Ref: TM00330_A01
-
*Mandatory photo required - Photo of Expand D subrack
Section 6
EXPAND F Subrack
-
a. Subrack installed in correct position as per rack layout
-
b. Correct mounting brackets used for rack type.
-
c. Power cables run correctly down RHS of rack.<br>
-
d. Signal cables run correctly down LHS of the rack.
-
e. Subrack label location and data correct
-
f. Subrack earthed correctly
-
g. Power and earth cables correct size.
-
h. Correct ferrules used on power and earth cables.
-
i. No bare metal or wires showing on the power connector.
-
j. All cabling secured correctly to Subrack and rack
-
k. Subrack Earth cable installed correctly on Subrack and APDP.
-
Ref: TM00330_A01
-
*Mandatory photo required - Photo of Expand F subrack
Section 7
RMX3200 Subrack
-
a. Subrack installed in correct position as per rack layout
-
b. Correct mounting brackets used for rack type.
-
c. Power cables run correctly down RHS of rack.<br>
-
d. Signal cables run correctly down LHS of the rack.
-
e. Subrack label location and data correct
-
f. Subrack earthed correctly
-
g. Power and earth cables correct size.
-
h. Correct ferrules used on power and earth cables.
-
i. No bare metal or wires showing on the power connector.
-
j. All cabling secured correctly to Subrack and rack
-
k. Subrack Earth cable installed correctly on Subrack and APDP.
-
Ref: TM00330_A01
-
*Mandatory photo required - Photo of RMX3200 subrack
Section 8
Opto-coupler Subrack
-
a. Subrack installed in correct position as per rack layout
-
b. Correct double height mounting brackets used for rack type.
-
c. Power cables run correctly down RHS of rack.<br>
-
d. Signal cables run correctly down LHS of the rack.
-
e. Subrack label location and data correct
-
f. Subrack earthed correctly
-
g. Power and earth cables correct size.
-
h. Correct ferrules used on power and earth cables.
-
i. No bare metal or wires showing on the power connector.
-
j. All cabling secured correctly to Subrack and rack
-
k. Subrack Earth cable installed correctly on Subrack and APDP.
-
l. Opto-coupler inset installed in correct position and ribbon cables secure
-
Ref: TM00330_A01
-
*Mandatory photo required - Photo of Optocoupler to Expand F and RMX; mount brackets and cable connections.
Section 9
AI Remote alarm IDF
-
a. IDF frame installed in correct position as per rack layout
-
b. IDF frame is secured and level<br>
-
c. IDF fully fitted. No blank block positions.
-
d. Earth strip fitted.
-
e. All cabling secured correctly to Subrack and rack
-
f. Correct colour code installed.
-
g. All wires terminated correctly.
-
h. No bare metal or wires showing.
-
g. Block designations installed and correct.
-
Ref: TM00330_A01
-
*Mandatory photo required - Photo of AI Remote alarm IDF
Completion
-
General Comments
-
This is the end of Photo Audit. Your audit result can be found under "Audits" menu. You can edit, preview and send your result via Email