Title Page
-
Conducted on
-
Prepared by
-
Location
Questions
-
Is there Asbestos? (Age of building)
-
Is there an R & D survey?
-
Start / Finish date + working times on site?
-
Scope of works?
-
Is the project F10 notifiable? (Longer than 30 days with more than 20 persons at the same time at any point or exceed 500 man days)
-
Who is the client?
-
Who is the client project manager?
-
Is there any external project manager?
-
Who is the principal designer?
-
Who is the site manager? FA? FM?
-
Max Number of operatives on project?
-
Who are the projects contractors?
-
Is there any client or other induction procedures / requirements?
-
Any nominated PPE requirements?
-
Any access arrangement requirements?
-
Any Dust / Noise / Working restrictions?
-
Any additional plant required? (Crane?)
-
Skip location?
-
Any works in a public area?
-
Welfare arrangements?
-
Any permits required?
-
Pre-Construction Information available?
-
Any existing site hazards? (Structure, SWL, chemicals, materials, etc)
-
Any other client information / requirement?