Cover

  • Site Name

  • Audited By

  • Date Of Inspection

  • Site Manager

  • Number of people on site?

1. Site Secuirty

  • 1.1 Are the Signing in and out procedures enforced ?

  • 1.2 Is there Secure hoarding's in place?

  • 1.3 Is there Suitable and sufficient segregation of construction and store or public areas?

  • 1.4 Is there Adequate safety signage to notify staff, public and operatives of works?

  • 1.5 Is the site secure to prevent unauthorised entry?

2. Construction Site Environment

  • 2.1 Is there evidence of weekly site inspections being carried out by the site manager?

  • 2.2 Are there sufficient housekeeping standards being observed?

  • 2.3 Is Good cable management observed?

  • 2.4 Client equipment not being used?

  • 2.5 Are there Appropriate storage areas?

  • 2.6 Is there Suitable and effective lighting to all construction areas and access routes?

  • 2.7 Is there evidence of a PAT testing for ALL Contractors electrical items on site?

  • 2.8 Is the use of 240v electric minimalised to a 240v power/charging area?

  • 2.9 Are waste facilities secure to prevent escape of waste, unauthorised use and theft of waste?

  • 2.10 Is waste properly contained (appropriate container) and not exposed to escape?

  • 2.11 Is Non Hazardous Waste segregated (non-hazardous electrical items and plasterboard)?

  • 2.12 Is Hazardous waste being segregated for separate disposal with a separate consignment ticket (fridges, freezers, fluorescent tubes, waste substances marked hazardous, containers and aerosols containing hazardous remnants)?

  • 2.13 Is waste segregated as it is put into skip?

  • 2.14 Are site temporary cabins plumbed into the sewer (foul drain) and not surface water drain?

  • 2.15 Is energy being used efficiently? (Lighting, equipment and heating turned off when not in use)

  • 2.16 Is water being used efficiently? (Not being wasted, leaks repaired quickly)

  • 2.17 Is environmental nuisance being prevented? (External noise, dust and odour)

  • 2.18 Are planning restrictions being adhered to? (Hours of operation etc)

  • 2.19 Is there evidence of the unauthorised release of ozone depleting substances? (Such as refrigerant gas)

  • 2.20 Is there any evidence of effluent discharge?

  • 2.21 Demolition works

3. Personal Protective Equipment

  • 3.1 Are all site managers, operatives and visitors fully compliant with Site PPE policy?

  • 3.2 Are operatives wearing correct PPE for their tasks as per their risk assessment?

4. Welfare and First Aid

  • 4.1 Are there a Sufficient number of first aiders nominated and available on site?

  • 4.2 Is there an Accident book or other forms of recording accidents in place?

  • 4.3 If accident book identifies injury, has it been reported?

  • 4.4 Are the First aid facilities appropriate?

  • 4.5 Are there Adequate toilets,hand washing and hygiene facilities provided?

  • 4.6 Are suitable and sufficient canteen areas provided?

  • 4.7 Are welfare facilities used with respect?

5. Fire and Emergency

  • 5.1 Is there a Site specific emergency plan in place?

  • 5.2 Is there a site specific Fire risk assessment in place, reviewed and signed by the site manager?

  • 5.3 Are the Emergency Escape routes unobstructed?

  • 5.4 Are the Emergency systems operational and is there a means of raising an alarm in place?

  • 5.5 Is the Fire fighting equipment on site appropriate for relevant tasks?

  • 5.6 If a permit to work is required, is there a process in place to notify the client?

  • 5.7 Has there been a fire drill?

  • 5.8 Is there adequate directional signage and exit signs?

  • 5.9 Has the Emergency lighting been checked and all ok?

6. COSHH

  • 6.1 Are there hard copies of COSHH assessments and safety data sheets for substances available on site?

  • 6.2 Are Substances being used appropriately as per COSHH assessments?

  • 6.3 Are Substances being stored appropriately to prevent environmentally damaging spills and as per COSHH assessments?

  • 6.4 Are there appropriate spill kits and containers for contaminated spill waste available? (If near a drain then a drain block also required)

  • 6.5 Do vehicles on site show signs of oil leakage (potential ground and rain contamination)?

7. Traffic/Vehicle Management

  • 7.1 Is there a site specific Traffic management plan in place?

  • 7.2 Where Banksman are identified in the traffic management plan, is there evidence of this role being managed?

  • 7.3 Is there separate pedestrian and vehicles access on site?

8. Work at Height

  • 8.1 Is the use of Step ladders minimised and is there a permit process in place?

  • 8.2 Is there evidence of Statutory scaffold inspections?

  • 8.3 Is there Evidence that MEWP's are inspected?

  • 8.4 Are those erecting scaffolds PASMA trained?

  • 8.5 Are MEWP operators adequately trained and are there training records available?

  • 8.6 Is Appropriate access equipment being used for tasks?

  • 8.7 Safe use of access equipment observed?

  • 8.8 Are tags in place and complete on Steps, Tower Scaffolds, Scaffolds & Mewps ?

  • 8.9 Are fall protection measures used in the safety systems?

  • 8.10 Are those erecting or dismantling scaffolding using work at height equipment?

  • 8.11Is there Scaffold handover certification available on site ?

  • 8.12 Is the Scaffold design available?

9. Occupational Health

  • 9.1 Are manual handling related risks controlled as per risk assessments?

  • 9.2 Are noise related risks controlled as per risk assessments?

  • 9.3 Is there Evidence of noise monitoring?

  • 9.4 Are vibration related risks controlled as per risk assessments?

  • 9.5 Is there Evidence of vibration monitoring?

  • 9.6 Are Dust levels kept to a minimum?

  • 9.7 Are Noisy operations adequately controlled?

10. Documentation

  • 10.1 Have the Actions from previous Health and Safety audit have been rectified?

  • 10.2 Is there Evidence that Construction Phase H&S Plan has been amended, signed and dated by the site manager following changes on site ?

  • 10.3 Is there a RAMS reviewal or Inspection process in place?

  • 10.4 Has everyone on site been inducted?

  • 10.5 Are there phasing plans in place?

  • 10.6 Are contractors working as per RAMS specific to project and task?

  • 10.7 Is there an F10 displayed on site which reflects the work taking place?

  • 10.8 Is there a H&S Law Poster displayed and completed?

  • 10.9 Is there a H&S Policy Statement on display and in date?

  • 10.10 Is Insurance documentation displayed and in date?

  • 10.11 Is there suitable Permit to work systems in place?

  • 10.12 Has the site diary been filled out and up to date ?

  • 10.13 Is there evidence of permission to tap into the mains water supply for water use on site? (Temporary connection)

  • 10.14 Is plumbing company approved by WIAPS scheme? (Water industry approved plumbers scheme)

  • 10.15 Is there evidence for contractors working on refrigeration and air conditioning systems are competent? (refrigerant gas qualifications)

  • 10.16 Is the Environment Policy Statement on display?

11. Training and Promotion of Health & Safety

  • 11.1 Have site specific Inductions been undertaken including Environmental Site rules and recorded ?

  • 11.2 Are Relevant toolbox talks undertaken and recorded?

  • 11.3 Has the Site manager or supervisor met all their training requirements?

  • 11.4 If site has Asbestos then have all operatives had Asbestos Awareness Training?

  • 11.5 Check at least 3 trades for competency ?

  • 11.6 Is there a Good promotion of Health and safety throughout the site? Eg Good use of notice boards, toolbox talks, etc?

12. Management of Asbestos Works

  • 12.1 Is there a Copy of Asbestos survey or register available on site?

  • 12.2 Are Asbestos emergency procedures understood by site manager?

  • 12.3 Asbestos Awareness training complete for site management?

  • 12.4 Are there copies of the projects asbestos refurbishment survey on site?

  • 12.5 If there is asbestos removal works taking place are the RAMS and POW present and accurate?

  • 12.6 Is there a copy of the HSE ASB5 notification and license kept on site?

  • 12.7 Is there adequate segregation and separation between the Asbestos works, contractors and client staff?

  • 12.8 Are the transit and waste routes being adhered to and demarcated appropriately? Photos required!

  • 12.9 Does the analyst or surveyor have his relevant proficiency certification?<br>For example: analyst P403-air monitoring, analyst P404+P404-air monitoring and clearances, surveyor-P402 <br>Use the comments section to record all applicable certifications.

  • 12.10 Can the site manager demonstrate that the client has been informed and engaged?<br>Record any evidence or simply ask client staff if present.

  • 12.11 Did the site induction include information about asbestos and Was it clear about the site arrangements with reference to asbestos?

  • 12.12 Are there arrangements in place to deal with asbestos related emergencies?

13. Waste Management

  • 13.1 Do waste tickets show segregated waste, correct waste code and destination?

  • 13.2 Waste carriers license. Is there a copy on site and is it in date?

  • 13.3 Waste Carriers environmental permit, is their a copy on site ?

  • 13.4 Is their a copy of the Environmental waste handbook on site and available?

  • 13.5 Are hazardous waste consignment notes being kept and are the details correct (waste details accurate, carrier and destination) ?

  • 13.6 Site Waste Management Plan available

14. Lifting Equipment

  • 14.1 Competency

  • 14.2 Pre use checks

  • 14.3 Thorough Examination Certificate

  • 14.4 Lifting Plan

15. Good Working Practise:

  • Good Working Practise:

15. Additional Information:

  • Enter comment:

Previous Audit - closed out

  • Enter Comment:

Sign off

  • Site manager Name and Signature

  • Auditors Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.