Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Daily Saw Pre-Operational Checklist
Daily Saw Pre-Operational Checklist
Daily Saw Pre-Operational Checklist
-
Select Day
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
Saw Identification
-
Is all required PPE being worn correctly and is it in good repair?
-
List all issues with the PPE present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Are the saw operators adequately trained? (RA, KSA and SWMS)
-
List the training undertaken prior to operation
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is the saw and surrounding area clean and clear of rubbish/debris and trip hazards?
-
List the issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is the air pressure at 6.5bar as per manufacturers specifications?
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is the water collection reservoir empty?
-
Drain the reservoir
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is the cutting oil level correct with no leaks in the system?
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is all the machine guarding in place and functional including the emergency stop?
-
Provide photo's of the issues
-
List all guarding issues and their location
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Are all cylinder, clamp arms and buffers free from leaks and damage? <br>(Ensure clamp cylinders are locked into position correctly after each adjustment)
-
Provide photo's of the issues
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Has the measuring device been calibrated?
-
Ensure it has been calibrated prior to beginning work
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Are all associated tools in good repair ready for use?
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Team Leader/Supervisor
-
Weekly Saw Pre-Operational Checklist
Weekly Saw Pre-Operational Checklist
Weekly Saw Pre-Operational Checklist
-
Select Week
-
Saw Identification
-
Upon inspection is the saw blade in good condition and free from hairline fractures?
-
Provide photo's of the issues
-
List the issues in detail and their position
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is the lubrication system working correctly for the saw?
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Is the extraction system working correctly? (empty the bags)
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Are all air lines in good condition and free from leaks?
-
List all issues present
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Are the conveyor rollers free from damage?
-
List all issues present and their location along the track
-
Has the problem been fixed (Closed) or does it need to be added to the CAR?
-
List the rectification actions
-
Team Leader/Supervisor