Information

  • Prepared by:

  • Date:

  • Job Code:

  • Client Name:

  • Location:
  • Project Description:

  • Personnel/Crew:

  • Photo of Location:

Framing

  • Inspect all existing framing for spacing/support usage. Determine if any additional framing/supports need to be added or modified. Note any situations that need architectural or engineering oversight/plans (if not already established in plans).

  • NOTES:

  • Review framing layout.

  • Review plumbing and electrical plans.

  • Review all engineering/architectural plans.

  • Inspect areas where framing is to be installed. Note any surfaces that need to be repaired/replaced or additional blocking/framing that needs to be installed for new framing. installation

  • NOTES:

  • Confirm all engineered/architectural materials/needs have been identified based on current framing. Note any discrepancies.

  • NOTES:

  • Confirm new framing will not conflict with any existing plumbing/electrical or new plumbing/electrical that is to be installed.

  • Do any changes need to be made to the framing layout?

  • Identify changes and locations. Explain why changes are needed:

Photos of discrepancies:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Will this affect completion date and/or budget?

  • Approx. how much additional time?

  • Approx. how much over budget?

  • Note any additional details:

  • Note any additional details:

  • Verify ALL framing materials are on-site or scheduled for delivery.

  • Verify ALL engineered materials are on-site or scheduled for delivery.

  • Verify ALL temporary support materials are on-site or scheduled for delivery.

  • Do any additional framing/engineered/temporary support materials need to be ordered?

  • Specify Type:

  • Specify quantity:

  • Specify locations of materials needed:

Show Locations:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Will this affect completion date and/or budget?

  • Approx. how much additional time?

  • Approx. how much over budget?

  • Note any additional details:

  • Date/time of material delivery:

  • Identify locations where temporary supports are needed and mark appropriately.

  • Layout framing location according to plans and mark appropriately.

  • Install any necessary blocking needed for framing/grab bars/fixtures/cabinets etc.

  • Mark all blocking appropriately. (i.e what it is for)

  • Install framing according to plans.

  • Confirm any additional framing for wall board has been installed.

  • Mark and specify all new plumbing locations appropriately (drains, vents, feeds etc.)

  • Mark and specify all new electrical locations appropriately. (switch/outlet boxes, whips etc.) Ensure sizes, quantity, and type are identified.

Take photos of all installed blocking and framing. Add any additional notes:

  • NOTES:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.