Framing
-
Inspect all existing framing for spacing/support usage. Determine if any additional framing/supports need to be added or modified. Note any situations that need architectural or engineering oversight/plans (if not already established in plans).
-
NOTES:
-
Review framing layout.
-
Review plumbing and electrical plans.
-
Review all engineering/architectural plans.
-
Inspect areas where framing is to be installed. Note any surfaces that need to be repaired/replaced or additional blocking/framing that needs to be installed for new framing. installation
-
NOTES:
-
Confirm all engineered/architectural materials/needs have been identified based on current framing. Note any discrepancies.
-
NOTES:
-
Confirm new framing will not conflict with any existing plumbing/electrical or new plumbing/electrical that is to be installed.
-
Do any changes need to be made to the framing layout?
-
Identify changes and locations. Explain why changes are needed:
Photos of discrepancies:
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Will this affect completion date and/or budget?
-
Approx. how much additional time?
-
Approx. how much over budget?
-
Note any additional details:
-
Note any additional details:
-
Verify ALL framing materials are on-site or scheduled for delivery.
-
Verify ALL engineered materials are on-site or scheduled for delivery.
-
Verify ALL temporary support materials are on-site or scheduled for delivery.
-
Do any additional framing/engineered/temporary support materials need to be ordered?
-
Specify Type:
-
Specify quantity:
-
Specify locations of materials needed:
Show Locations:
-
Add media
-
Add media
-
Add media
-
Add media
-
Add media
-
Will this affect completion date and/or budget?
-
Approx. how much additional time?
-
Approx. how much over budget?
-
Note any additional details:
-
Date/time of material delivery:
-
Identify locations where temporary supports are needed and mark appropriately.
-
Layout framing location according to plans and mark appropriately.
-
Install any necessary blocking needed for framing/grab bars/fixtures/cabinets etc.
-
Mark all blocking appropriately. (i.e what it is for)
-
Install framing according to plans.
-
Confirm any additional framing for wall board has been installed.
-
Mark and specify all new plumbing locations appropriately (drains, vents, feeds etc.)
-
Mark and specify all new electrical locations appropriately. (switch/outlet boxes, whips etc.) Ensure sizes, quantity, and type are identified.
Take photos of all installed blocking and framing. Add any additional notes:
-
NOTES:
-