Information

  • Prepared by:

  • Conducted on

  • Job Code:

  • Client Name:

  • Location
  • Project Description:

  • Photo of Site Location:

  • Review and verify scope of all permits.

Verify with Town

  • Verify if Insulation Inspection is needed.

  • Verify if board inspection is needed.

  • Verify if sub contractors need to be on-site during inspection.

  • Verify lead time for inspections.

  • Collect Inspectors business cards.

Review With Subs

  • Review scope of all permits.

  • Have all whips been installed in their appropriate locations according to specs?

  • Was the whip installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other whips been installed in their appropriate locations according to specs?

  • Was the whip installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Add media

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other whips not been installed or in the wrong location?

  • Was the whip installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other whips been installed in their appropriate locations according to specs?

  • Was the whip installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Verify all outlet box locations according to plans

  • Have all outlet boxes been installed and in their proper locations according to plans?

  • Was the outlet box installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other outlet boxes not been installed or in the wrong location?

  • Was the box installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other boxes not been installed or in the wrong location?

  • Was the box installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other outlet boxes not been installed or installed in the wrong location?

  • Was the outlet box installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Verify locations of all fixture boxes w/ plans.

  • Have all fixture boxes/cans been installed and in their proper locations according to plans?

  • Was the fixture box/can box installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other fixture boxes/cans not been installed or in the wrong location?

  • Was the fixture box/can installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Show Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other fixture boxes/cans not been installed or in the wrong location?

  • Was the fixture box/can installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Add media

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other fixture boxes/cans not been installed or installed in the wrong location?

  • Was the fixture box/can installed in the wrong location or not installed?

  • Installation Location:

  • Show Location

  • Proper Location:

  • Add media

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • For what?

  • Where does it need to be?

  • Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Are all fixture boxes/cans of the proper type? (i.e fan box w/ hanger bars for ceiling fan, old work cans etc.)

  • Location of box/can:

  • Show installed box/can:

  • What box/can was installed?

  • Specify box/can that was supposed to be installed:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Have any other fixture boxes/cans of the wrong type been installed? (i.e fan box w/ hanger bars for ceiling fan, old work cans etc.)

  • Location of box/can:

  • What box/can was installed?

  • Show installed box/can:

  • Specify box/can that was supposed to be installed:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Have any other fixture boxes/cans of the wrong type been installed? (i.e fan box w/ hanger bars for ceiling fan, old work cans etc.)

  • Location of box/can:

  • What box/can was installed?

  • Show installed box/can:

  • Specify box/can that was supposed to be installed:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Verify smoke/co detectors are installed in locations defined to fire code.

  • Have smoke/co detectors been installed in all locations to be compliant with building code?

  • Where does it need to be added?

  • Photo of Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Do any other smoke/co need to be added?

  • Where does it need to be added?

  • Photo of Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Verify all switch boxes have been installed according to plans.

  • Are all switch boxes of the specified type and in there specified location?

  • Is the switch box the wrong type or in the wrong location or both?

  • Location of installation:

  • Photo of location:

  • Type of box installed:

  • Specify proper type to be installed and what it's for:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Any similar discrepancies?

  • Location of installation:

  • Photo of location:

  • Type of box installed:

  • Specify proper type to be installed and what it's for:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Location of installation:

  • Photo of location:

  • Proper Location:

  • Photo of Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Any similar discrepancies?

  • Location of installation:

  • Photo of location:

  • Proper Location:

  • Photo of Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Location of installation:

  • Type installed:

  • Photo of location/type:

  • Proper location/type:

  • Photo of Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Any other similar discrepancies?

  • Location of installation:

  • Type installed:

  • Photo of location/type:

  • Proper location/type:

  • Photo of Location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Verify outlets/switches are spaced in compliance with building code

  • Do any outlets/switches need to be added?

  • Specify type of outlet/box to be installed?

  • Location of installation:

  • Photo of location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Are there any other outlets/switches to be added?

  • Specify type of outlet/box to be installed?

  • Location of installation:

  • Photo of location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Are there any other outlets/switches to be added?

  • Specify type of outlet/box to be installed?

  • Location of installation:

  • Photo of location:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

  • Are all GFCI's arc faulted?

  • How many need to be arc faulted?

  • What are the locations of GFCIs that need to be arc faulted?

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Add photos of locations:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Has fire stop been applied in all needed areas?

  • Specify where fire stop needs to be applied?

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Add photos of locations:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Verify wire staple installation and spacing.

  • Have all necessary nail plates been installed?

  • Have nail plates been supplied to us or do they need to be purchased?

  • Specify locations for install:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Show Locations:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Inspect wires for any damage caused during construction.

  • Have any wires been damaged?

  • Specify type/s of damage:

  • Specify location/s and what wire/s supplies:

  • How was wire damaged?

  • Specify how damage occurred:

  • Who caused the damage:

  • Specify Sub Contractor if known:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Show Location/s of damage:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Did you entire verify scope of plumbing is complete?

  • Are all drains in their proper locations? (sink, toilet, tub, washer/dryer, disposal)

  • Which Drain?

  • Where does it need to be?

  • Will this affect the completion date and budget?

  • Approx how long of a delay?

  • Approx. how much added cost?

  • Add any other necessary details:

  • Current Location

  • Proper Location

  • Any other improperly installed or missing drains?

  • Which Drain?

  • Where does it need to be?

  • Will this affect completion date or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Note any other necessary details:

  • Current location:

  • Proper location:

  • Any other improperly installed or missing drains?

  • Which Drain?

  • Where does it need to be?

  • Will this affect completion date or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Note any other necessary details:

  • Current location:

  • Proper location:

  • Any other improperly installed or missing drains?

  • Which Drain?

  • Where does it need to be?

  • Will this affect completion date or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Note any other necessary details:

  • Current location:

  • Proper location:

  • Any other improperly installed or missing drains?

  • Which Drain?

  • Where does it need to be?

  • Will this affect completion date or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Note any other necessary details:

  • Current location:

  • Proper location:

  • Are all hot/cold water feeds installed and in their proper locations? (sink, refrigerator, washer, tub/shower, toilet, baseboard heat, toe kick, hose bibs)

  • Which line?

  • Where does it need to be?

  • Is this going to affect the completion date and budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Any other necessary details to note:

  • Current location:

  • Proper location:

  • Any other improperly or missing water feeds? (sink, refrigerator, washer, tub/shower, toilet, hose bibs)

  • Which line?

  • Where does it need to be?

  • Is this going to affect the completion date and budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Any other necessary details to note:

  • Current location:

  • Proper location:

  • Any other improperly or missing water feeds? (sink, refrigerator, washer, tub/shower, toilet, hose bibs)

  • Which line?

  • Where does it need to be?

  • Is this going to affect the completion date and budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Any other necessary details to note:

  • Current location:

  • Proper location:

  • Are all vent pipes installed and in their proper locations?

  • Which vent pipe?

  • Where is it?

  • Where does it need to be?

  • Will this affect completion date and budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Any other necessary details:

  • Current Location:

  • Proper Location:

  • Any other vent pipes missing or installed in the wrong location?

  • Which vent pipe?

  • Where is it?

  • Where does it need to be?

  • Will this affect completion date and budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Any other necessary details:

  • Current Location:

  • Proper Location:

  • Note vent pipe location if it is near any hardware or cabinet location to avoid puncture.

  • Inspect all plumbing lines/feeds for damage caused during construction.

  • Have any lines/feeds been damaged?

  • Specify type/s of damage:

  • Specify location/s and what wire/s supplies:

  • How was line/feed damaged?

  • Specify how damage occurred:

  • Who caused the damage:

  • Specify Sub Contractor if known:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Show Location/s of damage:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Double check all window/door rough opening sizes/plumb/level.

  • Do any rough openings need to be fixed/altered?

  • Location/s and type/s:

  • Describe alterations to be made:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Show Locations:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Are all floor surfaces flat/level:

  • Location/s and type/s:

  • Describe alterations to be made:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Photos of location/s:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Is all framing flat/plumb?

  • Location/s and type/s:

  • Describe alterations to be made:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Photos of location/s:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Has all necessary strapping been installed?

  • Location/s and type/s:

  • Describe alterations to be made:

  • Will this affect completion time or budget?

  • Approx. how long?

  • Approx. how much over budget?

  • Date/time to re-install?

  • Date/time of installation:

Photos of location/s:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Verify all shut off locations.

  • Verify panel has been marked properly.

  • Verify if the sub is going to call for rough inspection.

  • Specify inspections to be scheduled by sub contractors:

  • Schedule all necessary rough inspections.

TAKE PHOTOS OF ALL SHUTOFF/PANEL LOCATIONS--ADD ANY NECESSARY PHOTOS:

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

  • Add media

ADD ANY FURTHER NOTES:

  • NOTES:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.