Title Page
-
Document No.
-
Audit Title - V1 - AM & PM
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Production Activities
-
Was the handover from the previous supervisor detailed and was the work area clean? <br>(Photos to be taken in support of statement. Hand over to cover off on WHSE, Operations, BAU details)
-
Have you reviewed the next day waves and or, inbound registers to determine staffing level requirements?<br>(This should be based on historical TAKT time measurements.
-
Have you conducted the daily toolbox?
-
Summary of toolbox main points
-
Have you received an acceptable number of 5S Shine Plans checks? Is the Flex board notices up to date?<br>(WHSE staffs to set level requirements)
-
Have all staffs (Team Leader and below), been involved in 'Cycle Counts' for the 2 hours leading up to BAU?<br>(Summarise the number of counts required on shift vs number completed)
-
Have all staff time sheets been revised, staff attendances validated against the scheduled roster and data entered into TMS?<br>( detail staff anomalies - eg. Unauthorised absences. Note: TMS data entries required by 08:30hours daily)
-
Has any overtime observed on the daily review been reviewed for accuracy and approval?
-
Do the current shift staff numbers match the production output requirements forecasted? (These numbers should be based on a production modelling tool).
-
Have forecasted staff numbers been matched against MHE requirements?
-
Do you have excess staffs on site today? Can these excess staffs be utilised in other BAU units?
-
Have the previous day's waves been been completed and finalised?<br>( Has corrective action processes been implemented or initiated to rectify the outstanding orders)
-
Have the goods returned, been allocated to the correct process required and located to the correct location?<br>(Warranty, Auction, Damaged, Pending OW response)
-
Have all response requirements for inbound stores with process issues been logged and dated?<br>(Are inbound time frames IAW SLA requirements)
-
Have putaways been processed and correctly located?<br>( A visual and system check should be conducted on each shift with attention placed on items carrying over from previous)
-
Do all outstanding operational production issues have a 'history' attached of corrective actions implemented for finalisation?<br>(short detailed description of date and event)
-
Has the MHE required for shift been checked for charge and serviceability?<br>(Supervisor to confirm prior to shift departure that the team has physically checked MHE and scanners)
-
Have the RF Scanners been accounted for and confirm that users have been signing the register for RF use?<br>(Take a photo of the register and insert)<br>( Are all RF scanners serviceable? Has A 'ticket' been raised with IT on broken or faulty equipments)
Training
-
Has RF Scanner training been conducted today?<br>(Details required)
-
When was the last training day that RF training was conducted?<br>(Insert photo of training document)
-
Date conducted
-
Was the movement process 'refreshed' at today's toolbox?<br>(Photo of toolbox attendance and or training record - files and archives to be maintained by supervisor)
-
Did the last toolbox discussion cover off on empty location checks?<br>(Photo of toolbox and or training record - supervisor to maintain active file)
-
Has the staff members involved in processing 'new lines', been trained in the SOP and cubiscan operations?<br>(Photo of training document - to be maintained by supervisor)
-
Photo of training register
EOS (End of Shift) Process requirements
-
Have all orders that can be processed, been finalised?<br>(Physical inspection required by supervisor at EOS)
-
Have all pallet movements been recorded and accounted for?<br>(Visual inspection of documentation required by supervisor)
-
Have all transport documents been prepared, drafted and or finalised?<br>(Visual inspection required by supervisor to confirm)
-
Have all paradigm entry requirements been emailed to the WHSE team?
-
Summarise any paradigm events that occurred on shift
-
Have outstanding paradigm events been reviewed with an aim of closure?<br>(Clear outstanding and advise WHSE team)
-
Has the assigned work areas and functional space been inspected for cleanliness and 5S compliance?<br>(Physical inspection required with corrective actions to be implemented before shift dismount)<br>(Bins and items used for refuse 'mediums' to be checked, empty pallets to be consolidated and placed on externals stacks)
-
Has all the MHE been put away into the correct location and placed on charge?<br>(Visual inspection required for compliance)
-
Was any equipment damaged during shift? <br>(Photos required for support, report to be drafted to WHSE)
-
Has any DBS MHE equipments been damaged during the shift? (Note: Any accidents caused by labour hire staffs are recoverable. These details will need to be forwarded to the WHSE site reps)
-
Was any stock damaged during the shift?<br>(Inventory to be notified. Photos required in support. Customer to be notified through inventory channels)
-
Stock damage summary
-
Was any pallet racking damaged during the shift?<br>(Are the beams still within the 'deflection' tolerances?)
-
Has the damaged racking been 'marked' to visually identify damaged racking - red spray ink - 'X'<br>(Supervisor to ensure WHSE are advised via a paradigm entry request)
-
Did any 'POP' suggestions present themselves during the shift?<br>(Are they worthy of escalation- supportive photos and detail)
-
Graphic of POP
-
Summary of POP
-
Has anyone identified a 'Better Way' proposal for BAU basics?<br>( Supervisor to ask staff regularly)
-
Ideas detail
-
Were there any significant events during the shift that were considered note worthy?<br>(These could be good or bad.... Morale affected)
-
Event details
-
Have you prepared a detailed handover for the oncoming supervisor?<br>( Summary should include WHSE events, operations debrief, BAU detail)
-
Summary of main points
-
Today's date and time
Additional Safety items
-
Are emergency exits unobstructed, clearly marked and visible?
-
On review, are all pallets in racking locations positioned correctly, and stretch wrapped as required?
-
Are bulk storage solutions stacks stable and have been stacked IAW recommendations?
-
Add signature