Information

  • Contractor

  • Document No.

  • Plot Reference

  • Client / Site: Greenwich Peninsula

  • Conducted on

  • Prepared by

Dear Sirs, You are notified that the works detailed below are not in accordance with your contract requirements. You must submit within 7 days, detailed proposals to remedy defects/correct the defective work to the satisfaction of Wates management. Should you fail to comply with this notice then we reserve the right to have the necessary works carried out on your behalf and charge you the full costs incurred.

Detail Of Defective Works ( to be completed by wates )

  • Description:

  • Photo Details:

  • Site Manager: Simon Thayer

Proposed Action To Correct ( to be completed by sub-contractor )

Proposed Action To Prevent Re-occurrence ( to be completed by sub-contractor )

  • Signed on behalf of Contractor :

Remedial Works Agreed with Appropriate Designer and/or Customer (to be completed by Wates)

  • See Attached Correspondence:

Root Cause of Defect (to be completed by Wates) Please tick below:

  • Design

  • Workmanship

  • Product Failure

  • Maintenance

  • S/C insolvency

Signed Off ( to be completed by wates )

  • Remedial Works Completed Satisfactory:

  • Action to Prevent Re-occurrence Completed:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.