Title Page
-
Project Reference Number
-
Architect/Client
-
Works Address
-
Description of Works
-
Prepared by
- Douglas MacPhee
- Chris Pritchard
- Gordon Murphy
- Julian Davis
- Neil Hutchinson
- Craig Wallace
-
Date of inspection
-
Location
-
This report has been carried out to identify the condition of a building/project at each stage of construction, prior to other trades following on, Or is to identify pre-existing damage and or defects to areas and associated surfaces, fixtures and fittings prior to works starting.
Delapitation Report
-
Is this report being carried out to ascertain the condition of a property prior to works on site?
-
Is this report to record interim completed works prior to the attendance of other contractors on site?
-
Is this report to review works upon completion of a project?
-
Is there any defects or damage evident relevant to the purpose of this report?
-
Please detail all relevant items in the fields below.
Add Room/Area location
-
Enter location.
- External surface areas
- External elevations
- Internal surfaces
- Internal Furniture
- Internal fittings
- Roof
- Attic space
- Corridor
- Lobby
- General Purpose Hall
- Office
- W/C's
- Cupboard/storage
- Plant Room
- Other (details in comments)
- Bedroom
- Hall
- Living Room
- Dining Room
- Utility Room
- Kitchen
- Garage
- Store/shed/outbuilding
- Basement/cellar
- Porch
- Conservatory
- Front elevation
- Rear elevation
- Right elevation
- Left elevation
-
Further room area description
-
Notes on observations.
-
Take photographs
-
Timestamp
Signatures
-
Supervisor/Manager
-
Signature
-
Date