Title Page
-
Site name
-
Site address
-
Conducted on
-
Conducted by
-
Location
-
Project Reference Number
-
Client
SITE SET UP
-
Site Boundaries - Secure/Maintained/No gaps
-
Means of separation e.g. high risk works from others, public protected from falling objects
-
Site rules prominently displayed at entrance
-
Details of person responsible for site, contact details for out of hours emergency
-
Requirement for site induction brought to attention of all workers (visitors)
Site Access (On & Around Site) -
-
Pedestrian segregation – clear routes, no trips etc, well signed
-
Separate vehicle access routes (one way system/turning points in place) signage
-
Off site road works - temp barriers, safe/controlled/disabled and pram route
-
Designated parking areas for staff vehicles
-
Designated areas for plant/equipment
Site Paperwork -
-
F10 prominently displayed
-
H&S Law poster prominently displayed
-
Site set up - plans
-
Services located/recorded
-
Record of deleterious materials
-
Workers booking in/out log
-
Visitors book
-
Site Induction procedures/log
-
Scaffold inspection records
-
Excavation inspection records
-
Permit to work (signed out and in)
-
Lift Plans (if appropriate)
-
Plant & Equipment Maintenance/ Inspection records
-
Training Records of workers on site (e.g. correct certificate for plant being used)
-
Construction Phase H&S Plan
-
Risk Assessments, Method Statements, Safe Systems of Work
-
Health and Safety File
Accident/Incident/Dangerous Occurrence Reporting -
-
On-Site procedures for completion of Forms or Accident Book
-
RIDDOR procedures in place
Welfare Facilities - Sanitary Conveniences & washing facilities
-
Toilets (male/female)
-
Water flush and mains sewer
-
Chemical toilets
-
Toilet Roll
-
Hot running water in toilets
-
Sinks (large enough for face/forearms)
-
Soap
-
Paper towels/dryer
-
Showers provided (if task particularly dirty or exposed to toxic /corrosive substances)
Rest Facilities
-
Potable water (including cups)
-
Area to prepare & consume refreshments
-
Kettle or urn (for boiling water)
-
Means of heating food (e.g. microwave)
-
Tables and chairs
-
Clean, warm, properly ventilated and lit
-
Built in water supply and drainage (for dishes)
Storing and drying clothing and PPE
-
Storage for clothing not worn on site
-
Storage for clothing needed for site work
-
Storage for PPE
-
Drying area (separate from eating area)
General Lighting
-
To accommodation and welfare units
-
To site and all work areas
Housekeeping
-
Designated Storage Areas
-
Designated Waste areas
-
Is site tidy? (skips etc)
-
Sufficient skips
-
Walkways and Stairways
Emergency Procedures
Fire
-
Fire Plan
-
Means of raising alarm
-
Means of Escape/Signage
-
Fire Extinguishers (type & in date)
-
Fire Assembly Point
First Aid
-
Designated First Aiders (prominently displayed including location of first aid kit)
-
Certificates in date
General Site & Environmental
-
Working at Height issues addressed
-
Visual check of scaffold
-
Hoists MEWP’s (SWL)
-
Roof work edge protection
-
Excavations guarded/safe
-
Overhead lines
-
Electric cables (ponds, trips etc)
-
PPE use/appropriate for task
-
Storage of Materials (fuel, gas, chemicals)
-
Spill Kits
-
Water suppression used as appropriate
-
Are site roads and public highways clear of mud, debris?
Other
-
Person(s) Undertaking Visit:
-
Signature :
-
Date: