Information

  • Survey Title

  • Client / Site

  • Conducted on

  • Surveyed By

  • Insert Name

Property Details

PROPERTY DETAILS

  • Site Address
  • Occupant Name

  • Occupant Contact Number

  • Main Electricity Provider

  • Building Type

  • Details

  • No. of storeys

Solar PV Survey

SOLAR PV SURVEY

  • Image of Property (side of PV Array)

  • Roof Covering

  • Please specify

  • Image of Tile

  • Roof Condition External

  • Roof incline

  • Orientation

  • Shading

  • Roof Height (m)

  • Roof Width (m)

  • Gutter Height from Floor (m)

  • Area available for Installation (m2)

  • Is there a Loft Hatch?

  • Image of loft hatch

  • Loft Ladders Installed?

  • Floor Boards in Loft?

  • Proposed inverter location

  • Image of Inverter Location

AC Installation

AC INSTALLATION

  • Can the cable be run internally with minimal disruption?

  • Provide Image of Cable Route

  • How will the cable be installed?

  • Provide Image of External Route

  • THE CABLE INSTALLED MUST BE 4.0mm SWA

External Obstructions

OBSTRUCTIONS

  • Are there any external obstructions?

  • Add Object

  • Obstruction
  • Enter details

  • Image of Obstruction

  • Flue Type?

  • Is the flue obstructing the scaffolding?

  • Image of Flue

  • GAS ENGINEER REQUIRED PRIOR TO WORKS COMMENCING - NO WORKS ARE TO BE CARRIED OUT UNLESS THE BOILER HAS BEEN ISOLATED

  • Does the flue run through the loft?

  • Image of Flue

  • GAS ENGINEER REQUIRED PRIOR TO WORKS COMMENCING - NO WORKS ARE TO BE CARRIED OUT UNLESS THE BOILER HAS BEEN ISOLATED

SCAFFOLDING/EASI DEC ACCESS

  • What is your preference for roof access?

  • Is the elevation free of obstruction?

  • Insert Image

  • Is there good access for Scaffolding

  • Please provide Image for Ease of Access

AC Supply

EXISTING AC SUPPLY CHARACTARISTICS

  • Utility Meter Serial Number

  • Image of Utility Meter

  • Incoming Supply

  • Consumer Unit Make

  • Consumer Unit Model

  • Insert Image of Distribution Board

  • Is there a spare MCB?

  • What is the MCB Size?

  • What is the MCB Type?

  • Is there a spare WAY in the fuse board?

  • Do you require a Garage RCD Unit?

  • Is there a DPI Installed?

  • PLEASE REQUEST A VARIATION FROM THE CLIENT AND ORDER DPI FROM NPOWER ONCE P/O HAS BEEN RECEIVED

  • Water Bond Present?

  • Size of Conductor

  • COMPLIANT WITH CURRENT IEE REGULATIONS

  • UPGRADE TO 10mm REQUIRED

  • UPGRADE TO 10mm REQUIRED

  • Gas Bond Present?

  • Size of Conductor

  • COMPLIANT WITH CURRENT IEE REGULATIONS

  • UPGRADE TO 10mm REQUIRED

  • UPGRADE TO 10mm REQUIRED

Structural Information

STRUCTURAL INFORMATION

  • Roof Structure External

  • Please specify

  • Depth of Truss (mm)

  • Width of Truss (mm)

  • Width Between Truss's (mm)

  • Internal Roof Timbers

  • Image
  • Image of Internal Roof Structure

Other Considerations

OTHER CONSIDERATIONS

  • Are there any other considerations?

  • Other Considerations

  • Consideration
  • Please detail any other information here

  • Please add any other photos here

  • Please draw any other information here

Declaration

DECLARATION

  • I can confirm that this survey has been carried out in a detailed and accurate manner.
    All information in this report is accurate and true.

  • Surveyors Declaration

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.