Information

  • Site Name

  • Installation engineer:

  • Company Name

  • Engineer 1

  • Engineer 2

  • Select date

Site InstallationDetails

  • Site Installation Work

Rectifier system installation

  • Rectifier type

  • Asset Number

  • Serial Number

  • Rectifier photo

  • Batteries installed

  • Battery photo

  • RackpowerBattery Fuse/Breaker Installation

  • Asset Number

  • Comments*

  • Add media

  • Rack powerMCB Panel Installation

  • Number of MCB installed

  • Asset Number

  • Comments*

  • Add media

AC/DC Installation Quality Check Sheet

  • AC mains checked and value at acceptable levels (220~240v)

  • Health check conducted for the rectifier and associated breaker panels. Output voltage levels etc

  • Rectifier, battery shelves are fastened properly in the rack

  • Breaker panels are properly installed

  • All cables terminated are properly sleeved and protected with heat shrinks

  • All power cables are properly labeled

  • Pictures of power cables termination, connectors, and labelling.

Tier III DMR installation

  • Repeaters

  • Repeater
  • Repeater model

  • Asset number

  • Serial number

  • Channel 1

  • Channel 2

  • Repeater photo(s) Front and rear

  • RF Installation - Antenna/Feeders

  • Description of work:

  • Add media

  • RF Installation - Combiner

  • Description of work:

  • Add media

  • RF Installation - Filters

  • Description of work:

  • Add media

  • RF cabelling

  • Description of work:

  • Add media

  • RF Filter tuning

  • Number of Channels tuned and the channel ID

Radio Installation Quality Check Sheet

  • Radios are fastened properly in the rack

  • All radios are properly labeled with correct channels

  • All BNC/N connectors are crimped and terminated correctly with proper tighthning

  • All cables are labelled

  • Pictures of BNC/N connectors on both sides, labelling,.

Commissioning Test Results

  • Please click "Add" to insert Comissioning test fields

  • Test
  • Address or GPS co-ordinates of location where radio test is conducted from
  • Distance to tower – can be calculated from GPS co-ordinates

  • LOS or partial LOS. Tower/hut visible from your standing location

  • Radio Chanel

  • Signal levels from the handheld radio unit

Switch Installation

  • Switch model

  • Switch model

  • Asset number

  • Serial number

  • Add media

Switch Installation Quality Check Sheet

  • Switch is fastened properly in the rack

  • IP diagram has been followed and all changes are recorded in red line diagram

  • Ethernet cabling is labelled for all connecting devices

  • Picture of ethernet cable connections on switch, labelling

Router Installation

  • Router model

  • Router Model

  • Asset number

  • Serial number

  • Add media

Router Installation Quality Check Sheet

  • is fastened properly in the rack

  • IP diagram has been followed and all changes are recorded in red line diagram

  • Ethernet cabling is labelled for all connecting devices

  • Picture of ethernet cable connections on switch, labelling

  • Comments Example: Any work taken out of scope or any changes required on the field not mentioned in design.

  • Additional pictures required Overview of the power rack Overview of the equipment rack Close-up of mains distribution Rectifier power socket Overview of the equipment room Outside building photo(s) Tower photo(s)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.