Information
-
Audit Title
Project Details
-
Inspection Date
-
Site Name
-
Site Address
-
SP/WO, Network
-
Staff Attending Site
-
Contact Details
-
Designer Name
-
Contact Details
-
Alternate Contact
Material and Site Delivery
-
Does the Top Hat Cabinet proposed location meet standards? Document number 010259W04
-
Is the Cabinet casing in good condition?
-
Is the DSLAM cabinet damaged- Check CCF, Check MEC, Check Locks on all doors, Check for ants nest etc<br>Document AKD-4386
-
Are all Pits installed at the cabinet location clear and level with the ground?
-
Is the Pillar in good condition for upgrade? (only required if new copper to be installed)
-
Is there parking for delivery truck? Note the parking requirements for the site
-
Are there any overhead obstruction. (Trees, power, lights etc)
-
Is there a presence of Asbestos in the pits where work is proposed?
-
Comments:
Photos & Standard Measurements
Site Delivery Point
-
Show the surrounding area from North, South, East & West. Also above.
-
Comments
Proposed TOP HAT & DSLAM Cabinet
-
Show the surrounding area from North, South, East & West of the cabinet. Trees and vegetation surrounding the proposed site location
-
Document & Photograph any damage to cabinet internal and external
-
Comments
Area of proposed Infrastructure/ Suite Build
-
Telstra Pit/Manhole
-
Closest Cross Road
-
Vegetation
-
Effect Customers
-
Back of Kerb or Fence line to proposed cabinet, >300mm
-
Nearest Power supply
Test the lean on the existing cabinet
-
Photo
-
Comments
-
The existing housing shall be within 50mm of level measured from the top of the housing to the bottom. Using a plumb bob, no more than 50mm lean from top to bottom corner.
-
* If this check fails then complete this section and advise David Stanley and the planner for a repair solution and cost approval via e-mail.
-
Is the cabinet on a lean?
-
Measured lean is __ mm
Measure distance to other structures
-
Minimum distance from rear of RIM/DSLAM cabinet to fence is 300mm.
-
* If this check fails then complete this section and advise David Stanley and the planner for a repair solution and cost approval via e-mail
-
If FAIL – Measured Minimum distance __ mm
-
Photo
-
Comments
Proposed Fibre FAP/s Joint
-
Show ports available
-
Show TAGS on proposed fibre sheath
-
Comments
Pillar Details (If required on project)
-
Pillar Location surroundings
-
Pillar with casing removed
-
Spare cable ports
-
Manhole & Pits (opened & closed)
-
Copper Joints
-
Comments
Fibre & Copper Conduits (If required on project)
-
Existing congested conduits
-
New conduits route and manhole/pit entry
-
Comments
Existing DSLAM
-
Show cabinet closed
-
Show Cabinet opened
-
Show any damages
-
Comments
Provide additional feedback
-
Photos
-
Comments
DSLAM Top Hat information
DSLAM Top Hat Site Survey Rack and Infrastructure Details
-
Site Name
-
Exchange ESA code
-
DSLAM RAU Code
-
Pillar ID
-
Copper Range
-
Cutover Joint Location
-
Top Hat port count
Proposed Fibres from ESA (Exchange end):
-
Exchange
-
F/S/R
-
Sheath ID
-
Fibres
Splicing
-
Fibre Splicing Locations
-
Comments
Build
-
(1) Is the Top Hat site clear of obstructions? (Maximum height of cabinet with Top Hat is 2.07m)<br>
-
If No, What type of obstruction
-
Can this obstruction be cleared? Please provide reason
-
(2) Is the DSLAM sturdy and level<br>
-
If No, What are the issues
-
Type of fibre is feeding the DSLAM from last FAP?
Additional details
-
Please provide details for additional preparation work for the Top Hat installation
Cabinet/Pillar Location information
-
(1) Is there any work required at an existing cabinet or pillar?
-
if ‘YES’ are there any obstruction preventing the increase to cabinet/Pillar size
-
Are there spare ports in the Cabinet or Pillar? (How Many?)<br>
-
(2) Is there sufficient space in the Cabinet feeding pit for an additional OJ?
-
(3) Please record any details not requested above and may be of interest for future design
-
(4) Are there any Environment issues visible
-
if ‘YES’ what are they?
-
(5) If new copper to be hauled is there any conduit to be upgraded due to congestion between the DSLAM and the Cabinet/Pillar - Nominate the congested conduits
Power Supply Info (to be used for Metering Pedestal)
-
All Victorian Top Hats will require a metering pedestal. Other states need only use this page if a new Green Boy Pedestal is to be installed.
All measurements are to be accurate with a wheel or tape measure.
Site information for power supply - Underground
-
Power Pit Supply Location
-
Distance from Top Hat
-
Distance to Nearest cross road
-
Distance from nearest structure (Not DSLAM)
-
Distance from Back of curb
-
Green Boy Measure from Cabinet, power pit & BOC
-
Location of nearest Aerial power
Site information for power supply - Aerial
-
Power Pit Supply Location
-
Distance from Top Hat
-
Distance to Nearest cross road
-
Distance from nearest structure (Not DSLAM)
-
Distance from Back of curb
-
Green Boy Measure from Cabinet, power pit & BOC
-
Location of nearest Aerial power
Second Power Pit
-
Is there second power pit within 100m
Site information for power supply - Underground
-
Proposed Pit Supply Location
-
Distance from Pit - Top Hat
-
Distance from Pit to Nearest cross road
-
Distance from pit to nearest structure (Not DSLAM)
-
Distance from pit to Back of curb
-
Green Boy Measure from Cabinet, power pit & BOC
-
Location of nearest Aerial power
Site information for power supply - Underground
-
Proposed Pit Supply Location
-
Distance from Pit - Top Hat
-
Distance from Pit to Nearest cross road
-
Distance from pit to nearest structure (Not DSLAM)
-
Distance from pit to Back of curb
-
Green Boy Measure from Cabinet, power pit & BOC
-
Location of nearest Aerial power
Other Information
-
Supply the closest aerial power pole location? HV,LV or HV & LV
-
Addition Power information or comments
Optical Fibre Table
Line System
-
Line System
-
A End
-
B End
-
Circuit
Optical Fibre Table
-
Optical Fibre
-
Site
-
Work Required
-
Connect From
-
Location From
-
Conn Type
-
Length
-
Conn Type
-
Location To
-
Connect To
Additional Optical Infrastructure
-
Are Additional Fibre sheaths available
-
ESA
-
Sheath ID
-
Fibre Count
-
Vacant Fibres
-
New OF Joints
Additional Data
-
Additional Data