Individual Crane Operator was wearing PPE properly:
-
Manager performing evaluation
-
Employee being evaluated
-
Crane being used
-
01. Hard hat. (May be removed while in cab)
-
02. Reflective devices. (Lime green, breakaway vest)
-
03. Steel toed safety boots.
-
04. Safety glasses with side shields. (Clear color must be worn at night)
-
05. Attends daily job briefing.
-
06. Visual inspection, records inspection.
-
07. Tests operation of pulleys, locks and arms.
-
08. Moves inside crane path if outside normal crane path, spotter must be available and in radio contact with operator.
Loading Trailers
-
09. Positions arms to proper lifting positions without striking arms on side of unit.
-
10. Engage arms for lift.
-
11. Raise nose for sand shoe to clear contact with ground allowing grounds person to properly adjust height.
-
Automatic Failure if rear wheels off of ground, lift motion not stopped while adjustment is made to legs.
-
12. Lift unit high enough to clear car.
-
13. Position unit as directed by grounds person.
-
14. Once kingpin is locked, perform “secondary lift” or “pull”.
-
15. Position tandems.
-
16. Raise arms. Remain over unit until arms are completely folded in stored position, if applicable.
-
Automatic Failure if visual contact between lift operator and grounds person is lost.
-
17. Loads trailers at company standard of 2 minutes per unit or faster.
Unloading Trailers
-
18. Position over trailer, lower arms and position properly for lift.
-
19. Move kingpin out of jaws, slowly not to damage auxiliary lock.
-
20. Lift high enough to clear car and place rear tandems on ground, leaving sand shoes off ground allowing grounds person to adjust height.
-
21. Lower unit to ground. Release arms and fold in full folded position.
-
(Automatic Failure if chassis with containers are not loaded according to manufacture markings)
-
22. Unloads trailers at company standard of 2 minutes per unit or faster.
Loading Containers
-
23. Position over unit, engage twist locks.
-
24. Lift unit slowly, allowing hostlers, if connected to chassis, to depart.
-
25. Place unit on pedestals. Adjust as necessary.
-
26. If top unit on double stack, ensure all IBC’s are in place and grounds person is clear.
-
27. Loads containers at company standard of 2 minutes per unit or faster.
Unloading Containers
-
28. Position over container engage twist locks.
-
29. Lift unit to clear pedestals or IBC’s.
-
30. Place unit on ground or chassis.
-
Automatic Failure if unit is lifted and left in the air while awaiting chassis.
-
31. Adjust unit on chassis as necessary.
-
32. Unloads containers at company standard of 2 minutes per unit or faster.
-
Any other observations?
-
Other observation photos.