Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous inspection
-
Has the last inspection been reviews?
-
Are all the items raised on the previous inspection closed?
M066 & V143 - Falls Prevention
-
Is the fall prevention plan up to date?
-
Are daily and weekly co-ordination meetings adequately controlling fall prevention issues?
-
Is all perimeter edge protection compliant with the fall prevention plan, with no gaps?
-
Are all MEWPs compliant and operating within a designated exclusion zone that is secure with linked barriers and signage?
-
Is steel frame erection in compliance with the fall prevention plan and exclusion zones in place?
-
Is concrete frame erection in compliance with the fall prevention plan and exclusion zones in place?
-
Are all riser shafts and penetrations covered with load bearing materials which are secured to prevent movements?
-
Are fall gates fitted to all lift shafts?
-
Has all scaffolding been checked by a competent person?
-
Is all scaffolding erected in compliance with the falls prevention plan?
-
Is signage on all loading bays noting maximum capacities?
-
Are all scaffolding tags on permanent, alloy towers and podium steps current?
-
Where ladders are used, has an adequate risk assessment been undertaken and signed off prior to use?
-
Are all tools tethered in compliance with falls prevention plan?
-
Do all staircases have double handrails and toeboards?
M067 & V142 - Logistics
-
Is the logistic plan up to date?
-
Is the perimeter hoarding in good order?
-
Are the site entrance controls in place, vehicle barriers, delivery driver PPE checks, delivery booking in procedures, turnstiles etc.?
-
Is there clear segregation between pedestrians and vehicles within the site and are these clearly signed and barriers in place?
-
Is the waste skip area clean, tidy, signage in place and are the skips empty or change overs ordered?
-
Are all operatives registered on the site access control system?
-
Are all operatives on site Incident and Injury Free trained?
-
Are all vehicle and pedestrian access routes clean and clear?
-
Is all plant operated by CPCS approved operators?
-
Are all safety critical workers Medicaid current?
-
Is all loading and unloading undertaken in compliance with the logistics plan?
-
Are all additional public protection measures in place, I.e. Exclusion zones, fans etc.?
-
Does housekeeping exceed the minimum Lendlease standards?
M068 & V145 - Health and Welfare
-
Is all first aid equipment checked and supplies stocked?
-
Are all welfare facilities clean and tidy?
-
Are all toilet facilities suitably stocked?
-
Is there sufficient welfare supplies in the stores, if not has an order been placed?
-
Are all COSHH materials stored in a designated COSHH store and does the store contain the COSHH data sheets?
-
Has weekly noise monitoring been undertaken?
-
Have all sub-contractors issued weekly HAVs records?
-
Are all manual handling assessments been issued?
-
Do all sub-contractors have adequate first aid cover?
-
Are all drying rooms tidy with no clothing stored over heaters?
M069 & V140 - Fire and Emergency
-
Is the fire and emergency plan current and up to date?
-
Is all materials stored internally within the building covered in flame retardant material?
-
Are all escape routes clean and clear and suitably signed?
-
Had a fire drill been undertaken in the last three months?
-
Are all fire points installed and contain the correct fire extinguishers, extinguishers in date, fire plan and break glass on fire point?
-
Is the definition located in the site office and in date?
-
Is the hit works procedure being followed? Record here hit works permit number checked during inspection.
-
Is the fire detection system in place on all floors and has the system been checked?
-
Has weekly fire point checks been undertaken and recorded?
-
Is the emergency grab pack current and located in the security hut?
-
Are all flammable materials stored in compliance with EDRs?
M070 & V144 - Environmental
-
Are all hay bales and booms in place and secure to the river elevation?
-
Are all fuel bowsers stored in designated area, locked, signage and spill kits in place?
-
Is all timber on site FSC and are security checking each delivery when arriving on site?
-
Are all water pipes free from leaks?
-
Have weekly electric and water meter readings been taken and recorded?
-
Is all waste being segregated?
-
Are all concrete wagons utilising the concrete sock?
-
Are all wildlife protection measures in place?
-
Are all silt run-off controls in place to prevent surface water runoff? I.e. Disconnecting manhole bunged?
M071 - Lifting and Slinging
-
Is the lifting plan current and up to date?
-
Is a sub-contractor lift plan in place for each lift?
-
Is are plant certification checked, current and filed?
-
Is all lifting works being undertaken in full compliance with the lifting plan?
-
Are all lifting equipment and accessories checked in good condition?
-
Are all lifting exclusion zones in place, with linked barriers and adequate signage?
-
Has weekly hoist checked been undertaken?
-
Has three monthly hoist maintenance check been completed?
-
Is all lifting co-ordination controlled by Lendlease lifting co-ordinator?
-
Are all forklifts in good condition, with reversing devices fitted and checked?
M072 & V141 - Civil and Groundworks
-
Are all excavation works being undertaken under a ground disturbance permit?
-
Are all excavations within exclusion zones, with suitable barriers and signage?
-
Are the necessary temporary works signed off for all excavations?
-
Are all buried services drawings up to date?
-
Are all excavation works fully compliant with the ground disturbance permit? Nite permit number checked.
-
Are all known buried services marked at ground level?
-
Are all plant operators CPCS?
-
Are all quick hitches fully automatic?
-
Are all confined space works compliant and covered by a permit? Note permit number checked.
M065 - Temporary Supply
-
Is the electrical safety plan current and up to date?
-
Are all extension leads safe and without damage?
-
Do all MDUs contain the temporary electrics drawings and all breakers marked?
-
Are all tools on site PAT tested?
-
Are all mains temporary electric cables marked?
-
Are all walkways clear of extension cables?
-
Auditors signature