Title Page

  • Assessement plan

  • Audit Objectives

  • Audit Criteria

  • Tenders/Bids evaluated

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Assessment participants

  • Others people present at audit

  • Documentations

  • EHS Procedures

  • Document number

Opening meeting

  • Are there any follow-ups to the previous evaluation?

  • list which ones

6 Planning

    6 Planning
  • Tender:

6.1.1 General

  • Is the contract/offer with the customer present?

  • Is the notarial articles of incorporation of the ATI present?

6.1.2. Hazard identification

  • Is the DUVRI/PSC provided by the Customer present?

  • list which ones

  • Is the radiation safety document provided by the Customer present?

6.1.3 Determination of legal requirements and other requirements

  • Are safety costs included in the contract or tender with the Customer?

  • Has the cooperation required by Article 26 of Legislative Decree 81/2008 and Article 112 of Legislative Decree 101/2020 been implemented with the customer?

  • Has the POS been sent to the RLS at least 10 days before the start of work?

7 Support

    7 Support
  • Tender:

7.1 Resources

  • Are there any suppliers provided in the contract with the customer?

  • Indicate the list of suppliers

  • Has the subcontracts been authorized by the customer?

  • Has consideration been given to outsourcing the Vigilanza of EHS aspects to an external provider?

7.3 Awareness

Environmental aspects

  • Has the procedure for waste management EHS-03-P07 been followed?

Health & Safety aspects

  • Have arrangements been made to safely secure the equipment to be disassembled?

  • Are meetings for management of EHS aspects present?

7.4 Communication

  • Indicate the communications to and from the Customer present

  • Indicate the internal communications present

7.5 Documented information

  • List Health & Safety documentation present

  • List Environmental documentation present

8 Operation

    8.1 Operational planning and control
  • Tender:

  • Has Vigilanza Preposti been carried out at this particular construction site?

8.1.4 Procurement

  • Are there any suppliers listed in 7.1?

  • Name of supplier

  • Have steps required in chapter 6.2 (informazioni documentate) of procedure EHS-03-P05 been followed?

  • Has all information required for cooperation and coordination under Article 26 of Legislative Decree 81/08 been acquired from subcontractors?

  • POS have been acquired from subcontractors?

  • Are subcontractors safety costs present?

  • Comment

  • 8.2 Emergency preparedness and response
  • Tender:

  • Is the customer's emergency response present?

10 Improvement

    Findings -Comments- Corrective Actions
  • Tender:

  • List any findings / comments / corrective actions

Overall conclusion

  • Number of health and safety non-conformities

  • Number of environmental non-conformities

  • Overall conclusion

Signature page

Signature

  • Auditor Signature

  • Audidee(s) Signature

  • Audidee(s) Signature

  • Audidee(s) Signature

  • Audidee(s) Signature

  • Audidee(s) Signature

  • Other person present at audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.