Title Page
-
Assessement plan
-
Audit Objectives
-
Audit Criteria
-
Tenders/Bids evaluated
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Assessment participants
-
Others people present at audit
-
Documentations
-
EHS Procedures
- EHS-03-P01-Sorveglianza sanitaria
- EHS-03-P02-Neoassunti_Cambio Mansione
- EHS-03-P03-Gestione DPI
- EHS-03-P04-Acquisti
- EHS-03-P04-D01-Materiale di consumo e attrezzature di lavoro
- EHS-03-P05-Gestione delle attività in appalto
- EHS-03-P06-D01-Criteri nomina PEI
- EHS-03-P07-Gestione rifiuti
- EHS-03-P08-Gestione Infortuni-NMGO-NC
- EHS-03-P11-Qualifica dei fornitori
- EHS-03-P12-Procedura Comunicazione al Registro delle operazioni commerciali (STRIMS) Sorgenti IR192
- EHS-03-P13-Sorveglianza Fisica e Sanitaria della Protezione
-
Document number
Opening meeting
-
Are there any follow-ups to the previous evaluation?
-
list which ones
6 Planning
- 6 Planning
-
Tender:
6.1.1 General
-
Is the contract/offer with the customer present?
-
Is the notarial articles of incorporation of the ATI present?
6.1.2. Hazard identification
-
Is the DUVRI/PSC provided by the Customer present?
-
list which ones
-
Is the radiation safety document provided by the Customer present?
6.1.3 Determination of legal requirements and other requirements
-
Are safety costs included in the contract or tender with the Customer?
-
Has the cooperation required by Article 26 of Legislative Decree 81/2008 and Article 112 of Legislative Decree 101/2020 been implemented with the customer?
-
Has the POS been sent to the RLS at least 10 days before the start of work?
7 Support
- 7 Support
-
Tender:
7.1 Resources
-
Are there any suppliers provided in the contract with the customer?
-
Indicate the list of suppliers
-
Has the subcontracts been authorized by the customer?
-
Has consideration been given to outsourcing the Vigilanza of EHS aspects to an external provider?
7.3 Awareness
Environmental aspects
-
Has the procedure for waste management EHS-03-P07 been followed?
Health & Safety aspects
-
Have arrangements been made to safely secure the equipment to be disassembled?
-
Are meetings for management of EHS aspects present?
7.4 Communication
-
Indicate the communications to and from the Customer present
-
Indicate the internal communications present
7.5 Documented information
-
List Health & Safety documentation present
- DUVRI
- Informativa rischi introdotti ex art 26
- Riunioni di cooperazione e coordinamento ex art.26
- Coordinamento delle misure di radioprotezione ex art 112 -113 d.gls 101/2020
- PSC
- POS
- Altra documentazione H&S predisposta dal committente
- None of the above
-
List Environmental documentation present
8 Operation
- 8.1 Operational planning and control
-
Tender:
-
Has Vigilanza Preposti been carried out at this particular construction site?
8.1.4 Procurement
-
Are there any suppliers listed in 7.1?
-
Name of supplier
-
Have steps required in chapter 6.2 (informazioni documentate) of procedure EHS-03-P05 been followed?
-
Has all information required for cooperation and coordination under Article 26 of Legislative Decree 81/08 been acquired from subcontractors?
-
POS have been acquired from subcontractors?
-
Are subcontractors safety costs present?
-
Comment
8.2 Emergency preparedness and response
-
Tender:
-
Is the customer's emergency response present?
10 Improvement
- Findings -Comments- Corrective Actions
-
Tender:
-
List any findings / comments / corrective actions
Overall conclusion
-
Number of health and safety non-conformities
-
Number of environmental non-conformities
-
Overall conclusion
Signature page
Signature
-
Auditor Signature
-
Audidee(s) Signature
-
Audidee(s) Signature
-
Audidee(s) Signature
-
Audidee(s) Signature
-
Audidee(s) Signature
-
Other person present at audit