Title Page
-
Site conducted
-
Address
-
Surveyor Name
-
Install Date
-
Installer Name
-
Installation Type
-
Inspection Date
Electrical Inspection
-
Has all rubbish and the customers property been left tidy?
-
Have the correct number of solar panels been fitted?
-
Are the completed electrical works of an acceptable standard?
-
Is the cable route to the customers approval and satisfactory?
-
Is the external clipping and cable containment to a satisfactory standard?
-
Has the external cabling been seperately contained. Low voltage and 230v
-
Has the internal cabling been trunked and of a satisfactory standard?
-
Have all solar PV works been fitted to the correct manufacturers specification?
-
Has the correct electrical protection and consumer unit been installed?
-
Has the generation meter been installed as close to the incoming supply as possible?
-
Have the AC isolators been installed correctly and local to the relevant supply
-
Is the inverter in the correct position and to manufacturers instructions?
-
Batteries (if supplied) in correct position and to manufacturers instructions
-
Has the DATA logger been connected and customer briefed on the use?
-
Have all relevant labels and notices been installed where necessary?
-
Has the customer been left with all associated operating manuals and a demonstration?
-
Has the incoming water supply been bonded with the correct sized cable?
-
Has the incoming gas supply been bonded with the correct sized cable?
-
Additional comments
Photographs
-
Bonding - Gas
-
Bonding - Water
-
External cable containment and cabling
-
Internal cable containment cabling
- Yes
- No
- N/A
-
AC isolator
-
Inverter and location
-
Labels and notices
-
Solar panels in situ
-
Consumer unit and RCD/RCBO protection
-
Data Logger
-
Additional photographs
- Yes
- No
- N/A
-