Project Details
General
-
Conducted on
-
Location
-
Name of Installer
-
Prepared by
-
Client
Solar Inspection
System Details
-
Please refer to manufacturers instructions / installation guides for specific equipment details
-
Inverter make and size
-
Inverter location
-
Is the inverter fully accessible?
-
Has the inverter been securely fixed to a non combustible material
-
Is the inverter adequately labelled
-
Has the minimum clearance for ventilation of the inverter been achieved
Electrical Inspection
-
Has a Double Pole Isolator been fitted?
-
Are security seals intact to mains supply? (cut-out and metering equipment)
-
Has the generation meter been installed in an accessible location? (this should be installed in a location in which the customer can access to read the meter)
-
Has the AC isolator been installed and labelled?
-
Is the AC Cable run satisfactory? (clipped using fire rated fixings)
-
Has the DC isolator been installed and labelled?
-
Is the DC cable run satisfactory (clipped/labelled)? (if the DC cable is external, this must be in PVC conduit and labelled)
-
Has a separate Solar PV consumer unit been installed? If YES, check the Solar PV Consumer has been wired correctly, labelled adequately and all breakers are in the on position
-
Has the Solar PV system been installed in the existing consumer unit? If YES, check all the breakers in the board are the same brand and the dedicated Solar PV breaker has been labelled.
-
Type and size of breaker
-
Do all cable entries comply with BS7671 18th Edition Wiring Regulations? (e.g. glands and grommets)
-
Has the consumer unit been blanked with plates where necessary?
-
Has a hard wired smoke detector been installed?
-
Is the smoke detector interlinked with other smoke detectors in the property?
-
Has a sufficient number of labels been fitted (one every 1.5 meter)?
-
During your inspection, have you identified any unsafe situations which require immediate attention? (This includes exposed conductors, DNO Issues and poor workmanship)
Roof Inspection
-
Total number of panels
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 16+
-
Has the DC cable correctly been fed through the roof using the overlapping roof felt? (If roof felt has been punctured, this will be a failure)
-
Does the PV array have the correct number of brackets and rails?
-
Do all panels appear to be straight and level?
-
Has the required boundary been left around the PV array?
-
Has the excess been cut down on the roof rails?
-
Have the DC cables been tie wrapped to the roof rail?
-
Has the bird guard been installed correctly?
-
Is there any damage to Roof Tiles?
Handover
-
Has loft boarding been installed?
-
Has a copy of the Solar PV system schematics been left on site? (this should be attached near the inverter)
-
Has a “SOLAR PV ON ROOF” (fire service sticker) sticker been attached in a visible area close to the main electrical consumer unit?
-
Has the householder been provided with a demonstration on how the system works
Inspection Signoff
-
Inspector Name & Signature
-
Client Name & Signature