Title Page

  • Address

  • Survey Date

  • Surveyor Name

  • Client

  • Scheme

Technical Information

General Tech Info

  • House Type

  • Build Form

  • Number of Bedrooms

  • Asbestos Suspected

  • Window Reveal Depth (mm)

  • Door Reveal Depth (mm)

  • Conservation Area

  • Site Constraints (Access/Egress/Utilities/Parking etc.)

  • Scaffolding Requirements

  • Solid Wall Gross Area (m2)

  • Solid Wall Nett Area (m2)

  • Cavity Wall Extension

  • Alley Way to Insulate

  • Main Heating Type

  • Gas Fire / Solid Fuel Fire / Open Fire

  • Mould Present

  • Damp Present

  • Protected Species

EWI Info

  • Elevation Pictures (Please Take Pics of Each Elevation)

  • Ventilation Present

  • Pipework Fixed to Wall

  • Gas Pipework (lm)

  • Water Pipework (lm)

  • DPC Present

  • Measurement Above Ground (mm)

  • Satellite Dish Present

  • Alarm Present

  • External Tap Present

  • External Lights Present

  • CCTV Present

  • Boiler Flue to Extend

  • Condensate Present

  • PRV Present

  • SVP Type

  • Rainwater Goods

  • Waste Pipes

  • Will Roofline Need Extending

  • Conservatory

  • BT Cable

  • DNO Mains Cables

  • DNO Cables Need Sheathing/Extending

  • Substrate Condition

  • Plant Growth on Substrate

  • Window Drainage in Place

Summary

  • Additional Comments & Property Summary

Elevation Plans

  • Elevation Plan Pics

Survey Signoff

  • Name & Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.