Information
-
Insert Property Address:
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
- Andrew Hepworth
- Andrew Pickles
- Andrew Shelton
- Ben Houghton
- Chris Smith
- Colin Moore
- Craig Marshall
- Curtis Bowen
- David Marsden
- Dean Maillie
- Gary Langstaff
- Jake Howarth
- John Morris
- Kyle Martin
- Luke Moore
- Mark Dannatt
- Mathew Lucas
- Nathan Booth
- Paul Carrick
- Ross wilson
- Thomas Analey
Installation Form
INSTALLATION FORM:
-
The details below must be true and accurate - This form will be used as part of the application process to the client.
These MUST be sent in to the office on a daily basis. -
Client:
-
If Other:
-
Installation Address:
-
Installation Date/Time:
-
DESCRIPTION OF WORKS COMPLETED:
-
Installation of DPI Switch (Via Meter Plus):
-
Renew Distribution Board:
-
Description of Mains Tails (i.e. 25mm &16mm earth at 3m):
-
Electrical Upgrade: (Add Quantities)
-
KITCHEN:
-
Double switched sockets:
- None
- 1
- 2
- 3
- 4
- 5
-
Switched fused spurs: (Please pick multiples)
- Fridge
- Tumble Dryer
- Dish Washer
- Heating
- Extractor
- Outside Light
-
Single switched sockets:
- None
- 1
- 2
- 3
- 4
- 5
-
Cooker Switch & Outlet:
-
Fluorescent Light:
-
BATHROOM:
-
Shower & 45amp Pull Switch:
-
2D Light Fitting & Pull Switch
-
Shaver Point:
-
MISCELLANEOUS:
-
230v Mains Interlinked Smoke Detectors:
- None
- 1
- 2
- 3
- 4
- 5
-
230v Mains Carbon Monoxide Detector Interlinked with Smoke Detectors:
-
Upgrade Single Socket To Double Converters:
- None
- 1
- 2
- 3
- 4
- 5
-
Installation of Wireless Doorbell:
-
EXTRACTION:
-
Installation of Kitchen Fan:
-
Installation of Bathroom Fan:
-
Installation of Positive Vent Unit:
-
4" Core Hole:
- None
- 1
- 2
- 3
- 4
- 5
-
6" Core Hole:
- None
- 1
- 2
- 3
- 4
- 5
-
Tumble Dryer Vent:
-
Replace Positive Vent Filter:
-
Service Positive Vent Unit:
-
ADDITIONAL ITEMS:
-
Additional Pendants Changed:
- None
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Additional Light Switches Changed:
- None
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
Additional Double Sockets Changed:
- None
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
-
YT2 Trunking Quantity Per Meter:
-
YT4 Trunking Quantity Per Meter:
-
50mm x 50mm Trunking Quantity Per Meter:
-
INSERT ANY WORKS COMPLETED WHICH AREN'T LISTED ABOVE:
-
Please Add Descriptions And Quantities:
-
Please Sign:
-
NOW YOU HAVE COMPLETED THE INSTALLATION FORM PLEASE MOVE ON TO THE QUALITY ASSURANCE FORM.
Quality Assurance Form
QUALITY ASSURANCE FORM:
-
ALL DETAILS BELOW MUST BE COMPLETED IN FULL AND ACCURATELY:
-
DISTRIBUTION:
-
DPI Switch Installed @ Incoming Supply:
-
Water and Gas Bonds Accessible and on view (Gas bond fitted to pipe work before 1st branch - 10mm Installed);
-
Blanks in Fuseboard Present -No Access to Live Parts:
-
Corsan 'Next Test' and 'Caution' Multi Colour stickers applied to Fuseboard:
-
RCD Protection installed on EVERY Ciruit:
-
Trunking Installed on all cables at the Fuseboard (No cables on show):
-
KITCHEN:
-
All Sockets Level and Secure:
-
All Safety Shields Remove:
-
Earth Sleeving Installed:
-
Fluorescent Light Fitting Installed:
-
Boiler Flex Installed Under The Tiles:
-
Accessories separate from other services -Min 150mm:
-
Correct Engraved Switched Fused Spurs Installed:
-
Engraved Jointed Blanking Plates Installed (Plates without Identification are NOT Permitted):
-
Tumble Dryer Vent fitted secure and level - Ducting installed Correctly:
-
BATHROOM:
-
IP Rated Light Fitting Installed:
-
Shower Installed Correctly - 45amp Pull Switch mounted away from Light Pull Switch:
-
12v Extractor Fan Installed and Tested - Blades free of Ducting:
-
External Grill Fitted Secure and Level:
-
HEATING:
-
Programmer and Roomstat Secure and Level:
-
3amp Fuse Installed in Switched Fuse Spur:
-
MISCELLANEOUS:
-
Trunking Secure and Level - Manufactured Bends Installed:
-
Cables in Loft Space Clipped and Secure - Neat and Tidy:
-
Positive Vent Unit Tested and Fully Functional:
-
Smoke Detectors & CO2 Detectors Interconnected - Smoke and CO2 Tests Carried Out with Artificial Spray:
-
Please Sign:
-
NOW YOU HAVE COMPLETED THE QUALITY ASSURANCE FORM PLEASE MOVE ON TO THE PART-P NOTIFICATION FORM.
Part P Notification Form
PART P NOTIFICATION
-
THIS MUST BE COMPLETED IN ALL CASES
-
17th Edition BS 7671 Compliance
-
IT IS ESSENTIAL THAT THE ITEMS BELOW HAVE BEEN COMPLETED TO COMPLY WITH REGULATIONS
-
Main Incoming Earth adequate (Insert Correct Cable Size):
- .75mm
- 1.0mm
- 1.5mm
- 2.5mm
- 4mm
- 6mm
- 10mm
- 16mm
- 25mm
- 35mm
-
Main Water Bond adequate (Insert Correct Cable Size):
- .75mm
- 1.0mm
- 1.5mm
- 2.5mm
- 4mm
- 6mm
- 10mm
- 16mm
- 25mm
- 35mm
-
Main Gas Bond adequate (Insert Correct Cable Size):
- .75mm
- 1.0mm
- 1.5mm
- 2.5mm
- 4mm
- 6mm
- 10mm
- 16mm
- 25mm
- 35mm
-
New Installation (New Build):
-
Replacement Consumer Unit:
-
One or More New Circuits:
-
Rewire of All Circuits:
-
Partial Rewire:
-
Lighting / Power Outdoors:
-
Electric Floor or Central Heating System:
-
Control Wiring Including Fire/Security/Heating/Cooling/Ventilation Systems:
-
Upgrade or Alterations to Means of Earthing:
-
Installation /Alteration of a Generator / Solar Voltaic System:
-
ELV Lighting within the Building:
-
DETAILS OF WORK:
-
Please select one of the areas in which the work was carried out:
-
Please enter the BS 7671 Installation Certificate Reference Number for this job (if available):
-
BS 7671 Certificate Number:
-
NOW YOU HAVE COMPLETED THE PART P NOTIFICATION FORM PLEASE MOVE ON TO THE CUSTOMER SATISFACTION FORM.
Customer Satisfaction Form
CUSTOMER SATISFACTION FORM
-
To be completed with the tenant present:
-
Did The Engineer Arrive On Time?
-
Was The Engineer Polite And Helpful?
-
Was The Engineer Smart And Presentable?
-
Was The Job Completed To A Satisfactory Level?
-
Did The Engineer Clean Away All Debris?
-
Is Your Fridge/Freezer Plugged In And Working?
-
Please Note Any Additional Comments That You Feel May Improve Our Service:
-
CUSTOMER DETAILS:
-
Customer Name:
-
Address:
-
Please Sign Below:
Please Confirm The Fridge/Freezer Have Been Reconnected And Are Fully Functional -Corsan (Northern) Ltd Take NO Responsibility For The Fridge/Freezer.
In The Absence Of The Occupant The Installing Engineer And The Supervisor Must Confirm The Fridge /Freezer Are Connected And Working. -
Customer:
-
Supervisor: