Title Page
-
Site conducted
-
Project Name
-
Project Number
-
Site Address
-
Apartment No.
-
Floor
-
Project Phase
-
Date and Time
-
Prepared by
-
Work area kept clear of Materials and waste
-
Work Area checked and satisfactory Cylinder room , in line with drawings
-
Data cables to Media units in Lounge ( 3 no ) ( amillan )
-
TV cables to Media units in lounge ( 2 ) & bedrooms 1 & 2 ( 1 each ) (Digital Direct )
-
Data / access control cable to front lobby for intercom (CS Solutions )
-
Black flex conduit in ceiling to service cupboard from corridor ( DBS) duct in cupboard below ceiling 100mm with fixing above wall with clip
-
All data point to service hub from corridor (amillan)
-
All TV coax installed ( Digital Direct)
-
All heating wiring installed ( spurs on right side)
-
Kitchen checked in line with Moores drawings
-
Kitchen pelmet lights cables installed
-
All heights checked
-
Putty pads checked
-
Fibre checked - BT , Virgin & Hyperoptics
-
Trunking installed in cylinder room
-
Signed to signify acceptance of the Area: -
-
Drayton Beaumont (Print Name and Signature)
-
Client (Print Name and Signature)