Title Page

  • Site conducted

  • Project Name

  • Project Number

  • Site Address
  • Apartment No.

  • Floor

  • Project Phase

  • Date and Time

  • Prepared by

  • Work area kept clear of Materials and waste

  • Work Area checked and satisfactory Cylinder room , in line with drawings

  • Data cables to Media units in Lounge ( 3 no ) ( amillan )

  • TV cables to Media units in lounge ( 2 ) & bedrooms 1 & 2 ( 1 each ) (Digital Direct )

  • Data / access control cable to front lobby for intercom (CS Solutions )

  • Black flex conduit in ceiling to service cupboard from corridor ( DBS) duct in cupboard below ceiling 100mm with fixing above wall with clip

  • All data point to service hub from corridor (amillan)

  • All TV coax installed ( Digital Direct)

  • All heating wiring installed ( spurs on right side)

  • Kitchen checked in line with Moores drawings

  • Kitchen pelmet lights cables installed

  • All heights checked

  • Putty pads checked

  • Fibre checked - BT , Virgin & Hyperoptics

  • Trunking installed in cylinder room

  • Signed to signify acceptance of the Area: -

  • Drayton Beaumont (Print Name and Signature)

  • Client (Print Name and Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.