Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site
-
Product
Job Planning & Safe Systems of Work for Working at Heights.
-
Has the technician/s undertaken a SWMS of the risks involved prior to carrying out the work?
-
Has the SWMS been completed correctly and signed by all personnel on site?
-
Does the SWMS match the job tasks and if not has the technician completed a risk assessment of any additional tasks?
-
Has the technician planned the job i.e. access & egress to minimise risk of a HSE incident?
-
Has the technician/s taken steps to identify & control environmental factors which may increase the likelihood of falls (i.e. moisture, lichen or dust on the roof, wind, heat)?
-
Is the technician using a fall restraint method fit for purpose and is the system being used correctly?
-
Has the technician/s tied off access ladder to the roof?
-
Has the technician barricaded any areas at risk to falling objects?
-
Is the installation site at least 2 metres from the overhead power lines or electrical service cables?
-
Is there a suitably qualified electrician and/or CEC accredited installer on site?
-
Are all harnesses in good working condition and within manufacturers use by dates?
-
Can the technician/s demonstrate a process for responding to an emergency on site?
-
Can the technician/s demonstrate an understanding of the emergency response (i.e. what is their role in event of an emergency?)
Contractor Presentation
-
Did the contractor arrive on site within the time frame allowed/quoted?
-
Was the contractor in uniform?
-
Was the contractor’s vehicle suitable for use?
-
Was the contractor’s vehicle clean?
-
Did the contractor present well?
Contractor Safety
-
Is there a suitably qualified electrician on site?
-
Is there a suitably qualified plumber on site?
-
Is the technician/s using safety switches on portable electric powered tools?
-
Has the technician identified, isolated and locked out power sources where appropriate?
-
If required is there two people on site for team lifting?
-
Has the contractor taken steps to minimise the handling of awkward or heavy materials and equipment?
-
Were any other OH&S issues noted?
Tools & Equipment
-
Do all power tools have correct safety tags?
-
Are ladders in good working condition, and being used in the correct manner?
-
Is the correct PPE being used and is all PPE in good working condition?
Customer’s Home
-
Is the contractor working inside the customers home? If yes,
-
Did the contractor remove his/her cap?
-
Did the contractor remove his/her boots?
-
Did the contractor use drop sheets to protect floors?
Environment & Work Area
-
Can the technician/s demonstrate an understanding of the contractors recycling policy & procedures?
Is waste being disposed of correctly, i.e. recyclable items separated from non recyclable?
-
Where hazardous substances are being used are MSDS/SDS data sheets available?
-
Are materials and preparation areas orderly, clean & tidy (i.e. trip hazards are minimised)?
-
Is the contractor planning on removing generated rubbish from site at the end of the job/day?
Training & Supervision
-
Can the technician/s demonstrate they are suitably trained to carry out the assigned works, this should include working at heights, using tools provided, correct use of PPE, and understanding of SWMS?
-
Are any non skilled or semi skilled labour on site being suitably supervised?
General information/observation
-
Was the contractor informed the job was being audited before auditor’s arrival on site?
-
Did the contractor appear to be suitably organised?
Additional comments
-
Additional comments
-
Add signature