Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Notification Of Service Mains Replacement - NOSMR form
-
1. Clear and correct job details. Date, work order, meter number and address completed and confirmed.
-
2. Tests and results completed and recorded clearly as required. NIT test, polarity, IR test, phase rotation, earth integrity, continuity, final test.
-
3. Clear and accurate diagram including POA distances from boundaries, property alignment, network pole connection location & details, street alignments, road clearance pole location & details, meter box location, service lengths and service clearances at centre of carriageway and kerb completed.
-
4. NOSMR signed by AUP and witness. AUP number provided.
NETWORK - POCC
-
1. Network pole number matches the NOSMR form details.
-
2. Correct connectors used on the network mains and attached as required.
-
3. Double bolt neutral connectors used at bundled network neutral conductor.
-
4. J-hook used and service clear off any live parts of network (i.e. streetlight, UGOH)
-
5. Open points and side of service connection matches NOSMR form details.
-
6. Old connectors removed from network mains.
-
7. Strain clamp installed correctly and service tensioned with no excessive sag visible.
-
8. All redundant materials and rubbish removed from site.
ROAD CLEARANCE POLE
-
1. Road Clearance Pole number matches the NOSMR form details.
-
2. Correct connectors used and attached as required.
-
3. Strain clamps installed correctly and service tensioned with no excessive sag visible.
-
4. All redundant materials and rubbish removed from site.
POINT OF SUPPLY
-
1. Q-hook or J-hook used and installed correctly.
-
2. Strain clamp installed correctly and service tensioned with no excessive sag visible.
-
3. Sleeving used to cover consumer mains at the POS.
-
4. Neutral tag attached to consumer neutral conductor at POS.
-
5. POA Bond installed where required and metallic connection sprayed over.
-
6. All redundant materials and rubbish removed from site.
METER BOARD
-
1. Using proximity tester check and verify no voltage exist on the meter box enclosure and it is safe to proceed.
-
2. Check and verify meter number matches the NOSMR form details.
-
3. Check if all fuses, covers, enclosures are sealed.
-
4. All redundant materials and rubbish are removed from site. Check bottom of the meter box.
FINAL CHECK AND SIGN OFF
-
1. Vegetation to service mains has minimum clearance of 0.5mtr.
-
2. All changes from Work Order noted and variation recorded.
-
Add signature