Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • D&R/LLW Request No:

  • ATW/Access Authority No:

(n/a - not applicable, c - compliant, n/c - non compliant)

  • 1. Can staff identify the appointed 'Worksite Coordinator'?

  • 2. Has the 'Worksite Hazard & Risk Assessment' been correctly completed for the tasks being undertaken?

  • 3. Have Safe Work Method Statements (SWMS) relevant to the work being carried out been noted on the WHRA and the associated control measures have been implemented and SWMS on site?

  • 4. Has a ‘Safe Area for Work’ been defined if identified as necessary by taping, signs, or barriers?

  • 5. Is there a ‘Traffic Control Plan’ in place?

  • Is the traffic control set-up consistent with approved traffic management plan/RTA requirements and adequate for the work site and are Pedestrian safety measures in place?

  • 6. Do all staff being audited on site have an Endeavour Energy Network Access Authorisation card with appropriate authorisations for work to be carried out?

  • 7. Are all staff wearing ‘protective clothing’ in the correct manner to appropriate protection to head, body, arms, legs and feet at all times?

  • 8. Is all ‘safety equipment’ on site in good order and being used correctly?

  • 9. Are ‘first aid kits’ available on site?

  • 10. Are ‘safety (rescue) kits’ positioned and ready for immediate use as required. As per Electrical Safety Rules?

  • 11. Has all paperwork appropriate for the work completed correctly?<br>AA LL  ATW  D&R Instruction  Switching Folder 

  • 16. Is ‘HV test and operating equipment’ is in good condition, within due test date and properly stored for mechanical protection on vehicles?

  • 12. Is the ‘Access Authority for Work’ consistent with the work being performed, as per the D&R Instruction and are all staff working within the “AA” signed on?

  • 13. If an Observer is required is he/she positioned to ensure good visibility and communication with person at all times?

  • 14. Do ‘isolation points’ have appropriate danger tags applied correctly?

  • 15. Are all ‘operational and working earths’ applied to the h/v apparatus in a correct manner and are earth stakes driven into at least 600mm?

  • 16. Is ‘HV test and operating equipment’ is in good condition, within due test date and properly stored for mechanical protection on vehicles?

  • 17. Are approved ‘portable operational earths, personal protective bonding leads’ and ‘L.V. bonding equipment’ in current test date?

  • 18. What is the general condition of vehicles?

  • 19. What is the standard of general housekeeping on site?

  • 20. Are all ‘elevated work platforms’ and ‘other mobile plant’ on site within ‘due electrical test date’ and is the daily check sheet completed?

  • 21. Do drivers of heavy vehicles > 12 Tonne GVM have the required RTA Work Diary and is it correctly filled out?

Comments

  • Notes.

  • Signed (Auditor)

  • Signed (Worksite Coordinator)

Non Conformances:

Actions Taken to resolve non-conformances:

  • Notes.

  • Date Completed:

  • Signed (Responsible Manager)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.