Title Page
-
Site conducted
-
Conducted on
-
Auditor
-
Process
-
Part number
Engineering & Manufacturing- AS9100
-
Is there a procedure for the control of Manufacturing
Is a Batch Card available for the production/process being performed?
-
Has the material been correctly issued and by approved personnel
-
Have all previous operations been completed and stamped?
-
Is there a drawing and any other relevant documents available and to the correct issue?
-
Are the quantities correct?
-
Do the dates run in sequence?
-
Are any inspection equipment being used, calibrated?
-
Has the correct CNC program been used (when applicable)
-
Has the correct setting sheet been used (when applicable)
-
Has a First Off been accepted and stamped - Is this identified
-
Have In-Process inspections been performed - are Patrol inspections being performed
-
Are defective parts suitably identified
-
Is Split Batching suitably controlled
-
Are development cards suitably identified
-
Is the inspection equipment stored adequately to prevent damage or deterioration?
-
Is the relevant tooling being used in adequate condition?
-
What process is in place to manage tooling, CAD data, CNC data?<br>Is there a register of tools?
-
Are there any amendments to the batch card; if so, have they been amended by an approved person and been amended correctly?
-
Are the inspection records correct and stamped?
-
Are any non-conforming product suitable segregated and identified?
-
Have any routing stages been changed and authorised?
-
Is Customer Supplied material suitable controlled and identified
-
Are Inspection personnel trained for the production/process being Inspected ?
Reporting
-
Auditor
-
Name of Auditee
-
Any NCRs have been accepted as a true reflection of any findings