Title Page
-
Conducted on
-
Conducted by
-
GPS Location
-
Project/Site Name
-
Project/Site Status
-
If present, list additional attendees/inspectors:
Audit and Inspection Items
Records Management
-
Is the latest version of the SWPPP available? Monitoring records present?
-
Is the latest CERS submittal and relevant documents (e.g., HMI, HMBP, etc.) available?
-
Are hazardous waste records (e.g., inspections, manifests, profiles, etc.) available?
-
Is the latest version of the SPCC plan present?
-
Are the latest emergency evacuation, release response, contingency plans available?
-
If applicable, are air quality records (e.g., generator PTO/ATC/PERP, etc.) present?
Site Management
-
Comment on the general housekeeping of the site. Any issues?
-
Observations on overall dust management and sediment control measures (e.g., rumble strips, construction stormwater BMPs, etc.)?
Waste Management
-
Comment on the general condition of the waste/hazwaste storage areas. Any issues?
-
Are waste drums properly labeled (e.g., accumulation dates, EPA ID, waste identifier)?
-
Are waste receptacles (trash bins, dumpster roll-offs, etc.) kept closed when not in use?
Water Quality
-
Are there any non-stormwater discharges? Authorized or unauthorized?
-
Are there indications of past or present leaks/spills? If so, are they being addressed?
-
For erodible areas, are proper BMPs (e.g., fiber rolls/mats, silt fences, etc.) in place?
-
Is secondary containment adequate for stationary sources (e.g., ASTs, totes, drums, portable toilets, etc.)?
-
Are drip pans in place for mobile equipment?
-
Are spill kits available, stocked, and located in high-risk areas (e.g., ASTs, hazwaste storage, fueling areas)?
Nuisance and Public Interests
-
Is dust suppression and sediment controls (e.g., track-out strips) adequate?
-
Are noise and vibration within reasonable limits?
-
For construction projects, is there posted signage with project info. (e.g., timeline, contact information, etc.)?
-
Are there any visible emissions emanating from the site?
Completion and Sign-Off
-
Further Comments
-
Corrective Actions
-
Project/Site Manager
-
Auditor