Information

  • Document number

  • Facade Type

  • Level

  • Elevation

  • Conducted on

  • Prepared by- Lider

CONTROL/CHECK

  • Check EPDM for tears and holes

  • Check for sharp edges (galv /alu corners, insulation nails etc. )

  • Check temperature and record for application. If necessary ensure heater is being used.

  • Check the application surface is dry and clean before Novoproof Kleber FA/I application?

  • Check the EPDM surface is dry and clean before Novoproof Kleber FA/I application?

  • Is Kleber FA/I fully applied to the sealing surface with a spatula and at the correct width? (40~60mm)

  • Is the EPDM notched with the right tools as per drawings?

  • Once the EPDM temporary fix to the surface is roller used to ensure full sealing?

  • Check EPDM interior/exterior corners if sealed properly.

  • Has the area been cleaned and waste including COSHH materials removed to allocated bins?

Comments

  • undefined

Inspected by

  • Lider

  • Witnessed by

  • Mace

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.